Free Quote — We reply in 2 minGet Quote

Villa and Hotel Construction in Aldea Zamá

Turnkey new builds in Aldea Zamá: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.

Recrea has been building houses in Aldea Zamá and its residential sections since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.

Construction cost in Aldea Zamá (2026): villas $15,600 – $32,400 MXN/m² ($860 – $1,790 USD/m²) and boutique hotels from $85,000 USD per key, depending on finish level and excluding land.

What a Villa Costs to Build in Aldea Zamá

Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).

House sizeConstruction costEquivalent
100 m² villa$2.0M – $3.2M MXN$110,000 – $177,000 USD
150 m² villa$3.5M – $5.9M MXN$193,000 – $326,000 USD
200 m² villa$4.6M – $7.8M MXN$254,000 – $431,000 USD
300 m² villa$9.7M – $17.5M MXN$536,000 – $967,000 USD

Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.

What a Boutique Hotel Costs to Build in Aldea Zamá

Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.

LevelUSD per keyWhat it includes
Branded residences / resort$140,000 – $230,000 USDInternational hospitality standard: spa, restaurant, common areas and resort service
Premium boutique$110,000 – $175,000 USDGenerous room, pool, terrace and designed common areas
Entry boutique$85,000 – $135,000 USDComplete room with the community’s finish standard, simple common areas

What a hotel needs beyond the build

  • Municipal operating licence and Civil Protection sign-off
  • Wastewater treatment plant sized to occupancy
  • Water supply and storage: cistern, pumping and, where needed, a desalination unit
  • Contracted electrical capacity with CFE plus a backup generator
  • Kitchen, laundry and service areas to health regulations
  • Hurricane protection: glazing, closures and a season protocol

Construction Process Step by Step

This is how we run every new build, with the timings we actually see in Aldea Zamá:

1. Lot review

Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.

1–2 weeks

2. Concept and budget

Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.

2–3 weeks

3. Construction documents

Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.

4–6 weeks

4. Permits and licences

Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.

4–20 weeks

5. Foundation

Soil mechanics, rock excavation, footings or mat foundation and under-slab services.

3–5 weeks

6. Shell and structure

Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.

10–16 weeks

7. Services and finishes

Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.

12–20 weeks

8. Turnkey handover

Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.

1–2 weeks

Total: 8 to 14 months of construction plus 3–5 months of design and permits.

What the Price per m² Includes — and What It Does Not

Included
  • Architectural, structural and MEP design
  • DRO and municipal building licence
  • Foundation and reinforced concrete structure
  • Electrical, plumbing and air-conditioning installation
  • Plaster, floors, paint, closet and kitchen carpentry
  • Ironwork, aluminium joinery and anti-corrosion protection
  • Cistern, water tank and pressure system
  • Final cleaning, testing and written 1-year warranty
Not included
  • The land and notary costs
  • Furniture and décor (quoted separately as FF&E)
  • Pool, landscaping and palapa if not contracted in the package
  • Solar panels, generator or home automation (optional)
  • Changes you request once construction has started

Permits and Building Rules in Aldea Zamá

Land use and the Tulum municipal licence with a DRO, plus SEMA environmental authorisation, which applies across practically the whole area. For lodging: first the land-use certificate with the right use; then the operating licence, Civil Protection sign-off, CFE capacity by occupancy and tourism registration. With SEMA involved, 3 to 5 months of permits — the process starts with the concept design.

The lot: what decides your foundation

Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.

Aldea Zamá is the part of Tulum where short-term rental is already consolidated: underground services, finished streets and year-round demand. That is why a rental villa works as well as an 8 to 20 key eco-chic boutique hotel. The condition is the usual one in Tulum: land use that allows the operation and the SEMA route resolved before opening, not after.

Useful guides: House construction in Aldea Zamá · House construction in the city · Commercial and hotel construction · Cost calculator

Why Build With Recrea

  • 196+ completed projects in the Riviera Maya since 2008
  • Fixed-price contract broken down by line item — no surprise overruns
  • One company for everything — architecture, permits, construction, electrical, carpentry, ironwork
  • Licensed DRO and architects — fully legal build, workers registered with IMSS
  • Weekly photo and video reports — built for owners who live abroad
  • Written 1-year warranty on structure and installations

Real Projects

Villa and Hotel Construction in Aldea Zamá — Recrea
Villa and Hotel Construction in Aldea Zamá — Recrea

Or send us your project details

Frequently Asked Questions

From $15,600 – $32,400 MXN per m² depending on finish level. A 150 m² house with a pool runs $3.5M – $5.9M MXN, land not included.

8 to 14 months of construction plus 3–5 months for design and permits. From first meeting to handover: 12 to 18 months for a 150–200 m² house.

Yes. After the construction documents we issue a closed itemised budget and a fixed-price contract with payments tied to verified progress. Only changes you request move the price.

Half our clients do. Bilingual fixed-price contract, milestone payments and a weekly photo and video report of real progress on your house.

Both work: the area has Tulum’s most consolidated short-term rental demand. The villa needs less operating structure; an 8 to 20 key boutique returns more per m² if you have a team to run it.

From $85,000 to $230,000 USD depending on level, with the eco-chic standard (chukum, hardwood, bioclimatic design) the area takes for granted.

Free quote for your house in Aldea Zamá

196+ completed projects. Fixed-price contracts. We reply in 2 minutes.

Get a quote on WhatsApp
Written 1-year warranty18+ years196+ projectsLicensed & DROInsured