Land, construction and Airbnb rates by zone — real data from 196+ projects. Tap any zone.
| Zone | Land (USD/m²) | Construction (MXN/m²) | Airbnb/night | |
|---|---|---|---|---|
| ● Cancún (suburbios) | $50–$150 USD/m² | $12,000–$24,000 MXN/m² | $80–150 USD | Zone guide → |
| ● Puerto Morelos | $80–$200 USD/m² | $12,000–$22,000 MXN/m² | $90–160 USD | Zone guide → |
| ● PDC — Ejidal / Colosio | $50–$120 USD/m² | $12,000–$20,000 MXN/m² | $70–120 USD | Zone guide → |
| ● PDC — Centro / 5ta Avenida | $200–$500 USD/m² | $14,000–$25,000 MXN/m² | $90–160 USD | Zone guide → |
| ● PDC — Playacar | $150–$350 USD/m² | $16,000–$30,000 MXN/m² | $120–250 USD | Zone guide → |
| ● Puerto Aventuras | $80–$250 USD/m² | $15,000–$28,000 MXN/m² | $100–200 USD | Zone guide → |
| ● Akumal | $100–$300 USD/m² | $14,000–$28,000 MXN/m² | $120–250 USD | Zone guide → |
| ● Tulum — Región 15 / La Veleta | $100–$250 USD/m² | $14,000–$26,000 MXN/m² | $100–200 USD | Zone guide → |
| ● Tulum — Aldea Zamá | $200–$450 USD/m² | $16,000–$30,000 MXN/m² | $150–300 USD | Zone guide → |
| ● Tulum — Zona Playa | $500–$1500 USD/m² | $20,000–$40,000 MXN/m² | $250–600 USD | Zone guide → |
| ● Tulum — Centro | $150–$400 USD/m² | $14,000–$28,000 MXN/m² | $80–180 USD | Zone guide → |
| ● Bacalar | $30–$100 USD/m² | $10,000–$18,000 MXN/m² | $60–150 USD | Zone guide → |
They are our own construction costs across the corridor, updated for 2026, expressed per built square metre and grouped by town and zone. They are not asking prices for land or property — those move for reasons that have nothing to do with what a house costs to build. Where a zone carries a premium here, it reflects real construction factors: access, logistics, development regulations, and ground conditions.
Island locations add roughly 15% for sea freight, lead times and crew accommodation. Gated developments add design review, restricted hours and access control. Areas near protected zones add environmental requirements that show up in drainage and wastewater rather than in finishes. And limestone with cavities or old fill adds foundation cost that has nothing to do with the postcode and everything to do with the specific lot.
Take the band for the zone, apply it to the area you want, then add the items that never appear in a per-square-metre figure: project fees at 4% to 8%, permits and DRO, the soils study, connections, furniture and the pool. That total, not the construction line, is what should be compared against the price of a finished property in the same zone.