Land Use, Density, COS and CUS

Five numbers on one municipal document decide what your lot is worth building on. Buyers routinely spend six figures before checking any of them.

What the certificate actually states

The municipal urban development programme assigns each lot a use — residential, mixed, tourist, commercial, conservation — and with it the limits that govern your project: density in dwellings or rooms per hectare; COS, the proportion of the lot your building footprint may occupy; CUS, the total built area you may have across all floors; maximum height in storeys; and required setbacks. Those five numbers determine the viability of a project before any architect draws a line.

COS and CUS, in plain terms

COS limits footprint: a COS of 0.6 on a 500 m² lot allows 300 m² of ground coverage. CUS limits total construction: a CUS of 1.2 on the same lot allows 600 m² across all levels. Together with the height limit they define the actual envelope. A lot with a generous CUS and a low height limit is a different building from one with the reverse, even though the totals look similar on paper.

How to obtain it, and when

Request the land-use certificate from the municipal urban development office with the cadastral key and the lot details. Some municipalities publish cartographic viewers, useful as a preliminary reference, but the document issued by the authority is the one that governs and the one the permit file needs. Get it before you buy — or make the offer conditional on it — not after you have commissioned a design.

DocumentWhat it gives youCost and time
Land use certificateUse, density, COS, CUS, height$1,500 – $6,000 MXN · 1 – 3 weeks
Alignment and official numberBoundaries and frontage$800 – $3,500 MXN · 1 – 2 weeks
Services feasibilityWater, drainage, power availabilityPer utility · 2 – 6 weeks
Construction licenceAuthorises the works, with DROBy area · 3 – 10 weeks

The things that override it

Inside a gated development, the internal regulations frequently impose stricter setbacks, lower heights, mandatory materials and colours, construction hours and completion deadlines. Those are enforceable against you regardless of what the municipality permits. Protected areas, the federal maritime zone and rights of way impose their own restrictions on top. Check all of them together, in the same week, before you commit.

Costs and timelines

These are the documents that precede any design work, with typical municipal figures for the region.

Related pages: Buying land: due diligence · The closing process · Versión en español · Concierge construction service

Frequently Asked Questions

Request the land-use certificate from the municipal urban development office using the cadastral key. Online cartographic viewers are a useful preliminary reference but the issued document is what governs.

COS is the proportion of the lot the building footprint may occupy. CUS is the total built area permitted across all floors. Together with the height limit they define what you can actually build.

Procedures exist but they are slow and uncertain, and depend on the urban development programme in force. Buying a lot on the assumption that use will change is taking a risk, not making a plan.

Frequently, and they are enforceable: greater setbacks, lower heights, mandatory materials, working hours and completion deadlines. Review them alongside the land use, before design.

Planning a project on this coast?

196+ completed projects. Fixed-price contracts. Reply in 2 minutes.

Ask on WhatsApp

For owners buying, building and keeping a home here

Where to build: area by area · Soils studies on limestone · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How to read a construction budget · The construction contract · How long a build takes

See the full concierge service →