Turnkey new builds in Tulum: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Aldea Zamá, La Veleta, Región 15 and central Tulum since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $1.7M – $2.7M MXN | $94,000 – $150,000 USD |
| 150 m² house | $2.9M – $4.9M MXN | $160,000 – $270,000 USD |
| 200 m² house | $3.8M – $6.5M MXN | $210,000 – $360,000 USD |
| 300 m² house | $8.1M – $14.6M MXN | $450,000 – $810,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Premium zones: Aldea Zamá · La Veleta · Tulum Country Club · Soliman Bay · Tankah Bay · Selvazama · Región 15, Tulum · the Tulum Hotel Zone · Holistika, Tulum · Región 8, Tulum · Región 12, Tulum · Tulum Centro
Permits: Construction permits in Tulum
This is how we run every new build, with the timings we actually see in Tulum:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 3–5 months of design and permits.
Tulum is the strictest municipality on the coast. On top of land use and the municipal licence with a DRO, most projects need environmental authorisation from SEMA (and an MIA where there is land clearing or proximity to cenotes or mangrove). The PDU caps density and height by zone and requires a minimum permeable green area. Budget 3 to 5 months for permits.
Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.
Tulum is the most expensive m² in the region — logistics, environmental rules and a premium finish standard (chukum, hardwood, bioclimatic design) — and also the strongest vacation-rental yield.
Useful guides: Construction company in Tulum · Construction permits in Tulum · Luxury villas in Aldea Zamá · Eco-lodges and retreats · Cost calculator · Construction guides


Tulum went from a stop on the road to its own municipality in little over a decade, and the administration is still catching up with the growth. It shows in the timescales: the state environmental file is the rule, services arrive unevenly, and the difference between two lots a hundred metres apart can be months of procedure. In exchange, land still costs less than in Playa del Carmen.
The water table sits at intermediate depth: conventional foundations work, but pool and cistern excavation is best scheduled outside the rainy season.
The competent municipality is Tulum, and the environmental file falls to SEMA, SEMARNAT en la franja costera.
What decides this particular plot: la SEMA estatal marca el calendario; el expediente ambiental es la regla, no la excepción.
Access: federal 307 y vialidades internas.
Low salt exposure. 316 stainless can be reserved for genuinely exposed work with 304 used indoors, which saves noticeably on metalwork and steel joinery without shortening service life.
There is no design committee: the municipal licence is essentially the whole procedure, which shortens the calendar and makes this kind of lot a good candidate for a fixed-price contract, with fewer unknowns underground.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.