Turnkey new builds in Chan Chemuyil: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Chan Chemuyil, Chemuyil and the Xcacel area since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $1.8M – $2.8M MXN | $99,000 – $155,000 USD |
| 150 m² house | $3.0M – $5.0M MXN | $166,000 – $276,000 USD |
| 200 m² house | $3.9M – $6.6M MXN | $215,000 – $365,000 USD |
| 300 m² house | $8.2M – $14.9M MXN | $453,000 – $823,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen
Nearby zones: Ciudad Mayakoba · Corasol · Cozumel · El Cielo, Playa del Carmen
Permits: Construction permits, licences and DRO
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
Tulum is the strictest municipality on the coast. On top of land use and the municipal licence with a DRO, most projects need environmental authorisation from SEMA (and an MIA where there is land clearing or proximity to cenotes or mangrove). The PDU caps density and height by zone and requires a minimum permeable green area. Budget 3 to 5 months for permits.
Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.
Chan Chemuyil sits 37 km from Playa del Carmen and 13 from Tulum, five kilometres from Xcacel, a sea-turtle sanctuary. It is the sensible alternative to expensive beachfront: accessible land, an established expat community and urbanised services, ten minutes from beaches with no gate fee and no crowd. Tulum municipality, so the environmental route is Tulum’s, not Solidaridad’s.
Useful guides: House construction in Akumal · House construction in Tulum · Construction company in Akumal · Cost calculator
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Chan Chemuyil began as a workers' community on the corridor and is today an unusual mix: permanent local housing alongside houses built by foreigners after a large plot with mature trees, without paying beachfront prices. It sits minutes from Xcacel and the Chemuyil beaches, with lots frequently over 1,000 m² and native vegetation worth surveying before setting out.
The water table sits at intermediate depth: conventional foundations work, but pool and cistern excavation is best scheduled outside the rainy season.
The competent municipality is Tulum, and the environmental file falls to SEMA.
What decides this particular plot: lotes amplios y arbolado maduro: el inventario de vegetación condiciona el desplante.
Access: desde la federal, calles interiores sin pavimentar en parte.
On an unpaved approach the site road is the first line item — hardcore and drainage ditches — not an improvisation in May: in the rainy season a concrete truck that cannot get in is a cancelled pour that still gets paid for.
Intermediate salt exposure, where a graded standard serves better than applying the beachfront recipe to everything: 316 stainless for anything permanently exposed to weather, 304 defensible indoors and under cover, quality-coated aluminium with stainless fixings — the galvanic couple between a steel screw and an aluminium frame remains the most expensive and most common mistake.
There is no design committee: the municipal licence is essentially the whole procedure, which shortens the calendar and makes this kind of lot a good candidate for a fixed-price contract, with fewer unknowns underground.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews