Design, licence and construction with a single contractor, for clients who live outside Mexico.
Puerto Morelos stopped being a district of Benito Juárez in 2016. Since then it has had its own planning department, its own code and its own timelines — and a file that worked in Cancún is no longer filed here as it stands.

The first thing we verify is jurisdiction. It sounds elementary, but in this corridor the municipal boundary is not where most people assume: the line with Benito Juárez to the north and Solidaridad to the south cuts through lots that listings describe as "Cancún" or "Riviera Maya". The land-use certificate is issued by Puerto Morelos, and only by Puerto Morelos.
The Puerto Morelos Reef National Park governs everything that happens on the seaward side. SEMARNAT is involved for environmental impact, ZOFEMAT for the federal strip, and the authorisation arrives with concrete conditions: runoff management, beach-facing lighting and wastewater treatment. To the west, mangrove defines the genuinely usable area, which is usually smaller than the deeded one.
A lot in the village or the inland neighbourhoods is a municipal job with services in the street: the process runs in weeks and the limestone allows conventional foundations. A lot on the front row or near mangrove is a federal file, with a six-to-twelve-month calendar, a high water table and a full marine specification. The price difference between the two rarely reflects the difference in complexity.
For turnkey new build we work in a range of MXN 12,500 to 26,000 per m² (roughly USD 680 – 1,420/m²). The low end is a straightforward inland house with local finishes; the high end is a jungle or sea frontage with pool, home automation and bespoke joinery.
A typical construction programme is nine to thirteen months for 200–350 built m², counted from licence in hand. Add one to three months if the lot needs a state environmental study, and six to twelve if ZOFEMAT is involved. The budget is issued as line items before signing, with a breakdown of what rises because the lot is in this municipality rather than in Benito Juárez.
We work turnkey. Lot survey and soil study, concept and executive design, licence filing with the responsible engineer, construction with our own crews, services, finishes, pool and landscaping, and handover with as-built drawings and equipment manuals. One contract, one point of contact and a programme that is not split across five suppliers blaming one another.
The budget comes out as line items with quantities and unit rates, not as a single lump figure. That way you can see where the money sits and what happens if a finish changes mid-build.
Most of our clients are abroad while the house is being built. The system is designed for that: a weekly report with dated photographs, a fortnightly video call from site, a live budget where every change is signed off before it is executed, and payments against verified progress rather than against the calendar. We work in Spanish, English, German, French, Russian and Chinese.
If the property sits in the restricted zone, a bank trust (fideicomiso) is the usual holding vehicle; we coordinate with the notary and the bank so that the construction file and the ownership file advance in parallel.
Independent municipality since 2016 — different authority, rulebook and timelines from Benito Juárez and Solidaridad.
Compare with the other 41 zones in the zone checker.
Many lots are advertised as "Cancún" but belong administratively to Puerto Morelos, a municipality since 2016. We check it on the land-use certificate before quoting, because it changes the office, the fees and the timeline.
Inland, with a complete file, four to ten weeks at the municipal counter. If the lot fronts the sea, SEMARNAT and the ZOFEMAT concession enter and the realistic horizon becomes six to twelve months.
A line-item budget with unit rates and a contracted amount. Any change is priced and signed before it is executed, and payments go against verified progress on site rather than against calendar dates.
One year on services and finishes and five years on structure and waterproofing, delivered with as-built drawings, technical datasheets and manuals for the installed equipment.
Villas and hotels in Puerto Morelos · Construction permits in Puerto Morelos · Houses in Playa del Carmen · Houses in Tulum · Zone checker · Cost calculator · Commercial construction in Puerto Morelos · Luxury villas in Puerto Morelos · Clinics in Puerto Morelos · Warehouses in Puerto Morelos · Fuel stations in Puerto Morelos
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews