How Much Does It Cost to Build a Hotel in Puerto Morelos? (2026)
The full budget for a hotel in Puerto Morelos in 2026 — construction and FF&E per key by class, soft costs, pre-opening and contingency — with worked budgets for a 20-key boutique, a 40-key city hotel and a 120-key resort. Figures from our own quotes.
Related: Hotel construction in Puerto Morelos · Hotel renovation in Puerto Morelos · Cost to build a hotel in Mexico · Hotel cost calculator
1. Construction and FF&E per key in Puerto Morelos (2026)
| Class | Per m² | m² per key | Construction per key | FF&E per key |
|---|---|---|---|---|
| Hostel / economy (2★) | $10,000–$14,000 | 28 | $270,000–$400,000 | $90,000–$160,000 |
| City / business (3★) | $13,000–$19,000 | 40 | $520,000–$740,000 | $160,000–$330,000 |
| Boutique / 4★ | $19,000–$26,000 | 60 | $1,110,000–$1,570,000 | $270,000–$650,000 |
| Luxury / 5★ | $26,000–$44,000 | 110 | $2,880,000–$4,800,000 | $650,000–$1,640,000 |
| All-inclusive resort | $22,000–$35,000 | 95 | $2,070,000–$3,310,000 | $440,000–$980,000 |
Puerto Morelos prices run about 9% above Cancún. Land and VAT are extra.
2. The full budget, not just construction
- Construction: 60–70% of the total.
- FF&E and OS&E: furniture, equipment, linens, operating supplies — 10–20%.
- Design, permits and supervision: 8–12% of construction.
- Pre-opening: hiring, training, systems, launch — 3–6%.
- Contingency: 5–10%.
3. Worked budgets
| Project | Construction | All-in before land |
|---|---|---|
| 20-key boutique hotel | $22.2M–$31.4M | $31.7M–$53.3M |
| 40-key city hotel (3★) | $20.9M–$29.6M | $31.2M–$51M |
| 120-key resort (5★) | $345.3M–$575.5M | $485.9M–$932.9M |
4. Building a hotel in Puerto Morelos
Puerto Morelos has a protected reef, a low-rise town and resorts along the coast to the north and south. Height and density limits are tight, the environmental review is strict and the market favours small, quiet, design-led hotels; costs run about 9% above Cancún.
5. Permits and timeline
Land use, environmental impact (state or federal MIA on the coast), construction licence with DRO, Civil Protection, water, wastewater and CFE connections, then operating licences. Design and permits 4–12 months; construction 10–16 months for a boutique, 18–30 for a resort.