How Much Does It Cost to Renovate a Hotel in Puerto Morelos? (2026)
Prices for a hotel renovation in Puerto Morelos in 2026: the three levels per key, line items from bathrooms to pools, budgets for 40 and 120-key hotels and how long each takes.
Related: Hotel renovation in Puerto Morelos · Hotel renovation cost per room · Hotel room renovation
1. Renovation cost per key in Puerto Morelos (2026)
| Level | Per key | 40-key hotel | 120-key hotel |
|---|---|---|---|
| Soft refresh | $160,000–$380,000 | $6.5M–$15.3M | $19.6M–$45.8M |
| Full guest room and bathroom | $440,000–$980,000 | $17.4M–$39.2M | $52.3M–$117.7M |
| Repositioning | $1M–$2.4M | $39.2M–$95.9M | $117.7M–$287.8M |
Puerto Morelos prices run about 9% above Cancún. VAT extra; working around an open hotel adds 15–30%.
2. Line items
| Item | Cost (MXN) |
|---|---|
| Soft refresh: paint, soft goods, lighting, artwork | $65,000–$165,000 |
| Case goods and seating (FF&E) | $85,000–$270,000 |
| Flooring: LVT, porcelain or engineered wood | $25,000–$75,000 |
| Bathroom: tub to walk-in shower, waterproofing, fixtures | $130,000–$305,000 |
| A/C unit replacement and controls | $40,000–$75,000 |
| Full guest room and bathroom | $440,000–$980,000 |
| Lobby, restaurant and bar, per m² | $16,000–$38,000 |
| Pool and deck | $0.4M–$2M |
3. What each level includes
- Soft refresh: paint, soft goods, LVT or carpet, lighting, artwork, some loose furniture.
- Full room and bathroom: case goods, flooring, bathroom to the waterproofing, A/C and controls.
- Repositioning: layout, facade and balconies, MEP and public areas, often for a new brand.
4. Renovating hotels in Puerto Morelos
Puerto Morelos has a protected reef, a low-rise town and resorts along the coast to the north and south. Height and density limits are tight, the environmental review is strict and the market favours small, quiet, design-led hotels; costs run about 9% above Cancún.
Open sample rooms before fixing the budget: corroded pipes, failed waterproofing and rusted rebar are what turn a refresh into a full renovation on this coast.
5. Timeline
A mock-up room first (3–6 weeks), then production floor by floor: 1–2 weeks per floor for a soft refresh, 4–8 weeks for full rooms; a repositioning takes 6–14 months in phases.
FAQ
Ready to Start Your Project?
196+ completed projects. Fixed-price contracts. Free quote within 48 hours.
Get Free Quote