How Much Does It Cost to Renovate a Hotel in Costa Mujeres? (2026)
Prices for a hotel renovation in Costa Mujeres in 2026: the three levels per key, line items from bathrooms to pools, budgets for 40 and 120-key hotels and how long each takes.
Related: Hotel renovation in Costa Mujeres · Hotel renovation cost per room · Hotel room renovation
1. Renovation cost per key in Costa Mujeres (2026)
| Level | Per key | 40-key hotel | 120-key hotel |
|---|---|---|---|
| Soft refresh | $180,000–$420,000 | $7.2M–$16.8M | $21.6M–$50.4M |
| Full guest room and bathroom | $480,000–$1,080,000 | $19.2M–$43.2M | $57.6M–$129.6M |
| Repositioning | $1.1M–$2.6M | $43.2M–$105.6M | $129.6M–$316.8M |
Costa Mujeres prices run about 20% above Cancún. VAT extra; working around an open hotel adds 15–30%.
2. Line items
| Item | Cost (MXN) |
|---|---|
| Soft refresh: paint, soft goods, lighting, artwork | $70,000–$180,000 |
| Case goods and seating (FF&E) | $95,000–$300,000 |
| Flooring: LVT, porcelain or engineered wood | $30,000–$85,000 |
| Bathroom: tub to walk-in shower, waterproofing, fixtures | $145,000–$335,000 |
| A/C unit replacement and controls | $40,000–$85,000 |
| Full guest room and bathroom | $480,000–$1,080,000 |
| Lobby, restaurant and bar, per m² | $18,000–$42,000 |
| Pool and deck | $0.5M–$2.2M |
3. What each level includes
- Soft refresh: paint, soft goods, LVT or carpet, lighting, artwork, some loose furniture.
- Full room and bathroom: case goods, flooring, bathroom to the waterproofing, A/C and controls.
- Repositioning: layout, facade and balconies, MEP and public areas, often for a new brand.
4. Renovating hotels in Costa Mujeres
Costa Mujeres is the newest resort corridor of Cancún: large all-inclusives, brand residences and new projects every year. Brand standards, hurricane design and coastal setbacks drive the budget; costs run about 20% above downtown Cancún.
Open sample rooms before fixing the budget: corroded pipes, failed waterproofing and rusted rebar are what turn a refresh into a full renovation on this coast.
5. Timeline
A mock-up room first (3–6 weeks), then production floor by floor: 1–2 weeks per floor for a soft refresh, 4–8 weeks for full rooms; a repositioning takes 6–14 months in phases.
FAQ
Ready to Start Your Project?
196+ completed projects. Fixed-price contracts. Free quote within 48 hours.
Get Free Quote