How Much Does It Cost to Renovate a Hotel in Cozumel? (2026)
Prices for a hotel renovation in Cozumel in 2026: the three levels per key, line items from bathrooms to pools, budgets for 40 and 120-key hotels and how long each takes.
Related: Hotel renovation in Cozumel · Hotel renovation cost per room · Hotel room renovation
1. Renovation cost per key in Cozumel (2026)
| Level | Per key | 40-key hotel | 120-key hotel |
|---|---|---|---|
| Soft refresh | $180,000–$430,000 | $7.3M–$17.1M | $22M–$51.2M |
| Full guest room and bathroom | $490,000–$1,100,000 | $19.5M–$43.9M | $58.6M–$131.8M |
| Repositioning | $1.1M–$2.7M | $43.9M–$107.4M | $131.8M–$322.1M |
Cozumel prices run about 22% above Cancún. VAT extra; working around an open hotel adds 15–30%.
2. Line items
| Item | Cost (MXN) |
|---|---|
| Soft refresh: paint, soft goods, lighting, artwork | $75,000–$185,000 |
| Case goods and seating (FF&E) | $100,000–$305,000 |
| Flooring: LVT, porcelain or engineered wood | $30,000–$85,000 |
| Bathroom: tub to walk-in shower, waterproofing, fixtures | $145,000–$340,000 |
| A/C unit replacement and controls | $45,000–$85,000 |
| Full guest room and bathroom | $490,000–$1,100,000 |
| Lobby, restaurant and bar, per m² | $18,000–$43,000 |
| Pool and deck | $0.5M–$2.2M |
3. What each level includes
- Soft refresh: paint, soft goods, LVT or carpet, lighting, artwork, some loose furniture.
- Full room and bathroom: case goods, flooring, bathroom to the waterproofing, A/C and controls.
- Repositioning: layout, facade and balconies, MEP and public areas, often for a new brand.
4. Renovating hotels in Cozumel
Cozumel hotels serve divers and cruise passengers: mid-size properties along the west coast, dive resorts and small hotels downtown. Everything arrives by ferry, so materials cost about 22% more than in Cancún and the schedule has to plan barges, weather and spare parts.
Open sample rooms before fixing the budget: corroded pipes, failed waterproofing and rusted rebar are what turn a refresh into a full renovation on this coast.
5. Timeline
A mock-up room first (3–6 weeks), then production floor by floor: 1–2 weeks per floor for a soft refresh, 4–8 weeks for full rooms; a repositioning takes 6–14 months in phases.