Works, services and licensing for retail, restaurants and offices with a single contractor.
Puerto Aventuras is a private development with a marina, controlled access and its own rulebook. Here the first filing is not municipal: it is the condominium committee, and without its approval the file in Solidaridad does not move.

Façades, colours, heights, signage, working hours, the truck access route and even where the skip sits are approved internally. We present the package to the committee with drawings and a programme, obtain the authorisation, and only then assemble the municipal file in Solidaridad. Reversing that order is the number one cause of stopped works here.
Retail lives off residents, boat owners and guests of the development’s hotels, not off Highway 307 traffic. It is a steadier, less seasonal flow than on the open coast, but a bounded one: the catchment does not grow because another unit opens. The scheme is sized against the development’s real register, not against highway traffic.
Gatehouse access with prior registration, loading windows, a ban on noisy work at certain hours and daily cleaning of the internal road. All of that lowers daily output and has to be budgeted, not discovered. We plan consolidated deliveries, storage inside the lot and personnel registered with the administration from day one.
Commercial shell: MXN 10,500 to 16,500 per m². Fit-out by use: MXN 9,000 to 21,000 per m². The premium over a highway-side unit comes from reduced output inside the condominium: restricted access, working hours and daily cleaning.
A 120–250 m² fit-out takes four to six months: four to eight weeks for committee approval, six to ten weeks for the Solidaridad licence — the two can partly overlap — and the rest in execution. Add Protección Civil for occupancy and COFEPRIS where food is handled.
We cover the full cycle: land-use and feasibility checks, executive and services design, licence filing with the responsible engineer, civil works, electrical, plumbing, air conditioning, extraction, voice and data, finishes, fixed furniture and signage. Handover comes with as-built drawings, calculation records and the files Protección Civil asks for.
Where the use handles food, we resolve the grease trap, extraction and washing at design stage rather than as a late adjustment: it is the item that causes the most retrofits and the most expensive to correct once the unit is finished.
A line-item budget with quantities and unit rates, changes signed before execution and payments against verified progress. The programme is organised by work fronts so services, finishes and equipment do not obstruct each other, and the opening date is set once the critical filings are resolved, not when the contract is signed.
Weekly reports with dated photographs and a fortnightly video call from site, in Spanish, English, German, French, Russian or Chinese. Most of our clients live outside Mexico and run the business remotely: the system is built for that.
Canal walls and breakwaters: any work at the edge carries its own permit.
Compare with the other 50 zones in the zone checker.
Typical 2026 construction budgets in Puerto Aventuras, before land and VAT:
| Project | Budget (MXN) |
|---|---|
| 150 m² retail unit | $1,499,000 – $2,498,000 |
| 800 m² plaza | $7,992,000 – $13,320,000 |
| 2,500 m² building | $24,975,000 – $41,625,000 |
Calculate your project in Puerto Aventuras
Same service in other zones: Costa Mujeres · Isla Mujeres · Holbox · Cancún · Puerto Morelos · Playa del Carmen · Cozumel · Xpu-Ha · Akumal · Chan Chemuyil · Tulum · Felipe Carrillo Puerto · Bacalar · Mahahual · Chetumal
Related in Puerto Aventuras: Gas stations · Clinics and hospitals · Hotel construction · Warehouses · Restaurant & Bar Fit-Out · Structural Steel · Steel Roofs & Canopies
The works stop even though the municipality has authorised them. That is why we present to the committee first and only assemble the Solidaridad file with their approval in hand. Same work, in the order that avoids doing it twice.
Yes, and they are enforced. The administration sets truck access windows and quiet hours, plus daily cleaning of the internal road. That cuts daily output by fifteen to twenty-five per cent, and we budget it that way from the start.
Yes, where the use and Protección Civil allow it. We define an operable core — access, washrooms, emergency exits and the services on that front — and execute the rest afterwards at hours that do not interfere. It has to be planned from the design stage; improvising it mid-build is expensive.
Depending on the use: land-use certificate, municipal construction licence, Protección Civil sign-off for occupancy and exits, the COFEPRIS operating notice where food is handled, and contracts or load increases with CFE and the water operator. We handle them inside the same contract.
House construction in Puerto Aventuras · Villas and hotels in Puerto Aventuras · Commercial construction in Playa del Carmen · Commercial construction in Cancún · Commercial and hotels on the Riviera Maya · Zone checker · Cost calculator · Luxury villas in Puerto Aventuras · Clinics in Puerto Aventuras · Warehouses in Puerto Aventuras · Fuel stations in Puerto Aventuras
Related: Warehouses in Puerto Aventuras · Plaza construction in Puerto Aventuras · Plaza renovation in Puerto Aventuras · Retail store fit-out in Puerto Aventuras · Retail store remodel in Puerto Aventuras · Apartment building construction in Puerto Aventuras · Gated community construction in Puerto Aventuras · Wedding & event venues in Puerto Aventuras · Marina & yacht club construction in Puerto Aventuras · Golf clubhouses in Puerto Aventuras · Dry-stack marinas & boatyards in Puerto Aventuras
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews