Retail, restaurants and offices — turnkey, with an opening date
On a commercial job the cost of delay almost always exceeds the cost of the saving. We build and fit out retail units, restaurants and offices in Playa del Carmen with the permit file under control from day one and an opening date that holds.

New build and fit-out: shopfront, glazing, flooring, electrical installation and air conditioning sized for the trade. In a plaza we agree hours and material access with management before the first delivery.
Hood and extraction with duct to roof, grease trap, gas line with a pressure test, slip-resistant flooring and hygienic finishes. The commercial build with the most Civil Protection requirements.
Ceilings, lighting, voice and data, access control and zoned climate. In an existing building the available electrical capacity and the duct route decide the scheme.
We have built for 7-Eleven and GoMart. We work to the brand manual and reconcile it with the Solidaridad code before filing, not at the inspection.
Solidaridad does not apply one rule. What is authorised in Gonzalo Guerrero is not authorised the same way in Ejidal, in Colosio or in the western subdivisions, and the permitted commercial trade varies with it. The lot’s land-use certificate is the only thing that settles it, and it is requested before the lease is signed.
The expensive mistake is assuming the trade operating next door can be repeated: much of the centre predates the current code and is no guide. Check the regime in the zone checker and the full process in construction permits in Playa del Carmen.
A unit on Quinta or the nearby pedestrian streets is built under different conditions from the rest of the city. There is no direct vehicle access during trading hours, so material arrives before dawn and in small loads; noise is capped; and the site coexists with neighbouring units that keep selling.
That does not raise the cost of materials, it raises the cost of hours. A programme calculated on full working days will not hold here. We budget on effective working days and agree the access windows in writing with the corridor management before mobilising.
Inland, away from the federal strip, the Solidaridad file is entirely municipal: no state or federal environmental authority takes part. With the land-use certificate in hand and the DRO appointed, the licence resolves in four to ten weeks.
That is a real difference from the Tulum municipality, where practically every project goes through the state SEMA and the calendar is measured in months. If your location decision is still open, that fact is worth more than the rent difference between two units.
The exception is the beachfront: there ZOFEMAT sits on top of the municipal process, with its own concession and its own timeline.
COS, CUS and storey limits change a lot between Centro, Ejidal, Colosio and Playacar.
Compare with the other 40 zones in the zone checker.
It depends more on the trade than on the floor area. A standard plaza fit-out sits in one range; a restaurant with a full kitchen, extraction, gas and a grease trap can cost double per square metre. We give a fixed figure after reviewing trade, unit condition and available capacity.
If the trade changes, yes. If it stays and the work does not touch structure, shopfront or main services, a remodelling-mode licence is usually enough. Civil Protection reviews again before you open in either case.
Yes, with agreed logistics: restricted-hour material access, capped noise and coexistence with neighbouring units. What changes is not the technique but the programme, and that is budgeted from the start.
With a complete file, four to ten weeks for the municipal licence. The bottleneck is usually the CFE feasibility ruling if capacity has to increase, and the Civil Protection sign-off for hood suppression.
We give a contractual date when the file is under our control from the start. If you arrive with filings half-done by a third party, we give a date after auditing them.
Commercial and office construction in the Riviera Maya · Construction permits in Playa del Carmen · Hospital and clinic construction · Commercial construction in Cancún · Zone checker · Cost calculator
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews