Free Quote — We reply in 2 minGet Quote

EV Charging Station & Charging Hub Construction in Playa del Carmen

Electric cars, rental fleets and taxis in Playa del Carmen are growing faster than public chargers. We build EV charging stations and charging hubs for gas station owners, plazas, hotels, fleets and investors: DC fast and Level 2 chargers, the transformer and CFE connection that are usually the real bottleneck, solar canopies, batteries that cut demand charges and the amenities that make drivers stop.

Quick answer: EV Charging Station & Charging Hub Construction in Playa del Carmen — 2026 prices: Level 2 charger (7–22 kW), installed: $47,000–$114,000 MXN; DC fast charger 60–150 kW, installed: $0.9M–$2.3M MXN; Transformer, substation and MV connection: $1.6M–$5.2M MXN; Solar canopy, per kWp: $23,000–$40,000 MXN.
EV charging stations by Recrea Construction in Playa del Carmen
A Recrea Construction project
Playa del Carmen 2026: Level 2 charger $47,000–$114,000 MXN installed; DC fast charger $0.9M–$2.3M; transformer and MV connection $1.6M–$5.2M. Solar canopy $23,000–$40,000 per kWp; a hub with 8 DC chargers runs about $14.6M–$33.3M.

What We Deliver

DC & Level 2

Chargers from the brands you choose, installed and commissioned.

Power Supply

Transformer, substation and CFE medium-voltage connection.

Solar Canopies

Steel canopies with PV that shade cars and cut energy cost.

Battery Storage

Batteries that shave demand peaks and keep chargers running.

Amenities

Lounge, café, restrooms and Wi-Fi for the 20–40 minute stop.

Hurricane-rated

Canopies and equipment pads designed for wind and flooding.

Power is the project

Chargers are bought off the shelf; the grid connection is not. DC fast charging needs medium voltage and a transformer, and CFE approval can take longer than the works. We size the load, file the CFE request first and design batteries and solar so you can open with the capacity you have and grow.

Sites that earn

A charger earns when it is where drivers wait anyway: plazas, hotels, gas stations, airports. We help you choose the bays, layout and signage, and add canopies and amenities that turn charging time into sales.

Building in Playa del Carmen

Playa del Carmen is the second market and the busiest for small and mid-size condo buildings: downtown near Quinta Avenida, Playacar, Centro Maya, the north and the Corasol corridor. Lots are narrow, municipal height limits are strict, and buyers are largely foreign investors who expect rooftop amenities and rental-ready units.

Licences are issued by the municipality of Solidaridad; we file the land use, construction licence with DRO and Civil Protection.

EV Charging Station Costs in Playa del Carmen (2026, MXN)

ItemCost
Level 2 charger (7–22 kW), installed$47,000–$114,000
DC fast charger 60–150 kW, installed$0.9M–$2.3M
Transformer, substation and MV connection$1.6M–$5.2M
Solar canopy, per kWp$23,000–$40,000
Battery storage, per kWh$9,000–$17,000
Charging hub: 8 DC chargers, canopy and amenities$14.6M–$33.3M

In Playa del Carmen: Hostel construction · Golf clubhouses · Commercial & dark kitchens · Church construction · Call centres & BPO · Bus terminals & depots · Daycares & kindergartens · Construction permits · Commercial construction
EV charging stations in other towns: Cancún · Chetumal · Puerto Morelos
Related: EV charging stations · Bus terminals & depots · Call centres & BPO
Commercial cost calculator · Plazas · Offices
Gas stations

Why Developers and Owners Build With Recrea

  • One contract from feasibility and permits to handover
  • Fixed price on a line-item budget, milestone payments against verified progress
  • Weekly dated photo and video reports — investors and head offices abroad never need to fly in
  • Built for this coast — salt, humidity, hurricanes and a high water table designed in from day one
  • 18+ years and 196 projects in the Riviera Maya — one-year written warranty

Tell us about your project

Frequently Asked Questions

In 2026 a Level 2 charger costs about $47,000–$114,000 MXN installed and a DC fast charger $0.9M–$2.3M; a hub with 8 DC chargers, canopy and amenities runs $14.6M–$33.3M.

For DC fast charging, almost always: the transformer and medium-voltage connection cost $1.6M–$5.2M.

Level 2 chargers 2–6 weeks; a DC hub 4–8 months, mostly the CFE connection.

Get a fixed-price estimate

Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.

Quote on WhatsApp
DC fast chargersCFE connectionSolar canopiesFixed priceWeekly reports18+ Years

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún · How Much Does It Cost to Build an Airbnb Villa in Mexico? · EV Charging Station Cost in Mexico (2026)

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews