How Much Does an EV Charging Station Cost in Mexico? (2026)

Cost of a ev charging station in Quintana Roo in 2026: the line items that make the budget, prices by town and what drives the cost. Figures from our own quotes and market prices.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: EV charging stations · Cancún · Playa del Carmen · Chetumal · Puerto Morelos · Gas stations

1. Costs in 2026 (Cancún base)

ItemCost
Level 2 charger (7–22 kW), installed$45,000–$110,000
DC fast charger 60–150 kW, installed$0.9M–$2.2M
Transformer, substation and MV connection$1.5M–$5M
Solar canopy, per kWp$22,000–$38,000
Battery storage, per kWh$9,000–$16,000
Charging hub: 8 DC chargers, canopy and amenities$14M–$32M

2. By town

TownFactorHub with 8 DC chargers
Cancún×1.00$14M–$32M
Playa del Carmen×1.04$14.6M–$33.3M
Chetumal×0.92$12.9M–$29.4M
Puerto Morelos×1.09$15.3M–$34.9M
Cozumel×1.22$17.1M–$39M
Isla Mujeres×1.26$17.6M–$40.3M
Holbox×1.30$18.2M–$41.6M

3. Power is the project

Chargers are bought off the shelf; the grid connection is not. DC fast charging needs medium voltage and a transformer, and CFE approval can take longer than the works. We size the load, file the CFE request first and design batteries and solar so you can open with the capacity you have and grow.

4. Sites that earn

A charger earns when it is where drivers wait anyway: plazas, hotels, gas stations, airports. We help you choose the bays, layout and signage, and add canopies and amenities that turn charging time into sales.

5. Not included

  • Land, VAT and financing
  • Design and permits: 6–10% of construction
  • Contingency 5–10%

FAQ

In 2026 a Level 2 charger costs about $45,000–$110,000 MXN installed and a DC fast charger $0.9M–$2.2M; a hub with 8 DC chargers, canopy and amenities runs $14M–$32M.

For DC fast charging, almost always: the transformer and medium-voltage connection cost $1.5M–$5M.

Level 2 chargers 2–6 weeks; a DC hub 4–8 months, mostly the CFE connection.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews