EV Charging Station & Charging Hub Construction in Puerto Morelos

Electric cars, rental fleets and taxis in Puerto Morelos are growing faster than public chargers. We build EV charging stations and charging hubs for gas station owners, plazas, hotels, fleets and investors: DC fast and Level 2 chargers, the transformer and CFE connection that are usually the real bottleneck, solar canopies, batteries that cut demand charges and the amenities that make drivers stop.

Quick answer: EV Charging Station & Charging Hub Construction in Puerto Morelos — 2026 prices: Level 2 charger (7–22 kW), installed: $49,000–$120,000 MXN; DC fast charger 60–150 kW, installed: $1M–$2.4M MXN; Transformer, substation and MV connection: $1.6M–$5.5M MXN; Solar canopy, per kWp: $24,000–$41,000 MXN.
EV charging stations by Recrea Construction in Puerto Morelos
A Recrea Construction project
Puerto Morelos 2026: Level 2 charger $49,000–$120,000 MXN installed; DC fast charger $1M–$2.4M; transformer and MV connection $1.6M–$5.5M. Solar canopy $24,000–$41,000 per kWp; a hub with 8 DC chargers runs about $15.3M–$34.9M.

What We Deliver

DC & Level 2

Chargers from the brands you choose, installed and commissioned.

Power Supply

Transformer, substation and CFE medium-voltage connection.

Solar Canopies

Steel canopies with PV that shade cars and cut energy cost.

Battery Storage

Batteries that shave demand peaks and keep chargers running.

Amenities

Lounge, café, restrooms and Wi-Fi for the 20–40 minute stop.

Hurricane-rated

Canopies and equipment pads designed for wind and flooding.

Power is the project

Chargers are bought off the shelf; the grid connection is not. DC fast charging needs medium voltage and a transformer, and CFE approval can take longer than the works. We size the load, file the CFE request first and design batteries and solar so you can open with the capacity you have and grow.

Sites that earn

A charger earns when it is where drivers wait anyway: plazas, hotels, gas stations, airports. We help you choose the bays, layout and signage, and add canopies and amenities that turn charging time into sales.

Building in Puerto Morelos

Puerto Morelos is low-rise by design: strict height and density, a protected reef and a careful environmental review. Buyers want quiet, small, well-built projects; costs run about 9% above Cancún.

Licences are issued by the municipality of Puerto Morelos; we file the land use, construction licence with DRO and Civil Protection.

EV Charging Station Costs in Puerto Morelos (2026, MXN)

ItemCost
Level 2 charger (7–22 kW), installed$49,000–$120,000
DC fast charger 60–150 kW, installed$1M–$2.4M
Transformer, substation and MV connection$1.6M–$5.5M
Solar canopy, per kWp$24,000–$41,000
Battery storage, per kWh$10,000–$17,000
Charging hub: 8 DC chargers, canopy and amenities$15.3M–$34.9M

In Puerto Morelos: Golf clubhouses · Daycares & kindergartens · Construction permits · Commercial construction
EV charging stations in other towns: Cancún · Playa del Carmen · Chetumal
Related: EV charging stations · Bus terminals & depots · Call centres & BPO
Commercial cost calculator · Plazas · Offices
Gas stations

Why Developers and Owners Build With Recrea

  • One contract from feasibility and permits to handover
  • Fixed price on a line-item budget, milestone payments against verified progress
  • Weekly dated photo and video reports — investors and head offices abroad never need to fly in
  • Built for this coast — salt, humidity, hurricanes and a high water table designed in from day one
  • 18+ years and 196 projects in the Riviera Maya — one-year written warranty

Tell us about your project

Frequently Asked Questions

In 2026 a Level 2 charger costs about $49,000–$120,000 MXN installed and a DC fast charger $1M–$2.4M; a hub with 8 DC chargers, canopy and amenities runs $15.3M–$34.9M.

For DC fast charging, almost always: the transformer and medium-voltage connection cost $1.6M–$5.5M.

Level 2 chargers 2–6 weeks; a DC hub 4–8 months, mostly the CFE connection.

Get a fixed-price estimate

Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.

Quote on WhatsApp
DC fast chargersCFE connectionSolar canopiesFixed priceWeekly reports18+ Years

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún · How Much Does It Cost to Build an Airbnb Villa in Mexico? · EV Charging Station Cost in Mexico (2026)