Free Quote — We reply in 2 minGet Quote

Veterinary Clinic & Animal Hospital Construction in Puerto Morelos

Pet ownership in Puerto Morelos has grown with the expat and young family population, and owners expect hospital-level care. We build veterinary clinics and animal hospitals for vets, groups and investors: surgery suites with gases, shielded imaging, isolation wards, kennels, grooming and boarding — with the drainage, ventilation and acoustic control that keep neighbours and inspectors happy.

Quick answer: Veterinary Clinic & Animal Hospital Construction in Puerto Morelos — 2026 prices: Veterinary clinic fit-out, per m²: $13,000–$24,000 MXN; Veterinary hospital new build, per m² (surgery, imaging, wards): $24,000–$41,000 MXN; Surgery suite with anaesthesia and oxygen: $1.3M–$3.3M MXN; X-ray room with lead shielding: $0.7M–$1.7M MXN.
Veterinary hospital construction by Recrea Construction in Puerto Morelos
A Recrea Construction project
Puerto Morelos 2026: clinic fit-out $13,000–$24,000 MXN per m²; new veterinary hospital $24,000–$41,000 per m²; surgery suite $1.3M–$3.3M. A 150–250 m² clinic runs about $2.7M–$6M; a 600–900 m² hospital $17.4M–$34.9M.

What We Deliver

Surgery

Operating rooms with oxygen, anaesthesia scavenging and washable finishes.

Imaging

X-ray, ultrasound and CT rooms with shielding to regulation.

Isolation

Separate wards and air for infectious cases.

Kennels & Boarding

Drained runs, durable finishes, noise and odour control.

Grooming & Retail

Grooming rooms, pharmacy and pet shop front.

Drainage & Hygiene

Floor drains, grease and solids traps, and easy-clean surfaces.

Flow, hygiene and noise

A good vet hospital separates clean from contaminated, dogs from cats and patients from the waiting room. We plan the flow with your team, then specify floor drains, washable surfaces, separate ventilation for isolation and acoustic walls around kennels so barking stays inside.

Imaging and permits

X-ray and CT rooms need shielding calculated by a physicist and registered with the health authority; surgery needs medical gases installed to standard. We include the shielding study, gases and the documents for the sanitary licence.

Building in Puerto Morelos

Puerto Morelos is low-rise by design: strict height and density, a protected reef and a careful environmental review. Buyers want quiet, small, well-built projects; costs run about 9% above Cancún.

Licences are issued by the municipality of Puerto Morelos; we file the land use, construction licence with DRO and Civil Protection.

Veterinary Hospital Construction Costs in Puerto Morelos (2026, MXN)

ItemCost
Veterinary clinic fit-out, per m²$13,000–$24,000
Veterinary hospital new build, per m² (surgery, imaging, wards)$24,000–$41,000
Surgery suite with anaesthesia and oxygen$1.3M–$3.3M
X-ray room with lead shielding$0.7M–$1.7M
Clinic 150–250 m², complete fit-out$2.7M–$6M
Veterinary hospital 600–900 m²$17.4M–$34.9M

In Puerto Morelos: Marina & yacht club construction · Car wash construction · Construction permits · Commercial construction
Veterinary hospital construction in other towns: Cancún · Playa del Carmen · Chetumal
Related: Veterinary hospital construction · Clinical labs & imaging centres · Funeral homes & crematoria
Commercial cost calculator · Plazas · Offices
Hospitals & clinics

Why Developers and Owners Build With Recrea

  • One contract from feasibility and permits to handover
  • Fixed price on a line-item budget, milestone payments against verified progress
  • Weekly dated photo and video reports — investors and head offices abroad never need to fly in
  • Built for this coast — salt, humidity, hurricanes and a high water table designed in from day one
  • 18+ years and 196 projects in the Riviera Maya — one-year written warranty

Tell us about your project

Frequently Asked Questions

In 2026 a clinic fit-out costs about $13,000–$24,000 MXN per m²; a complete 150–250 m² clinic $2.7M–$6M and a 600–900 m² hospital $17.4M–$34.9M.

Yes: we add drainage, ventilation, shielding and acoustic walls inside an existing local or plaza unit.

Clinic fit-out 2–4 months; a new hospital 8–12 months.

Get a fixed-price estimate

Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.

Quote on WhatsApp
Surgery suitesImaging shieldingKennels & boardingFixed priceWeekly reports18+ Years

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún · How Much Does It Cost to Build an Airbnb Villa in Mexico? · Cost to Build a Veterinary Clinic in Mexico (2026)

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews