Free Quote — We respond in 2 minGet Quote

How Much Does It Cost to Build a Veterinary Clinic in Mexico? (2026)

Cost of a veterinary clinic in Quintana Roo in 2026: the line items that make the budget, prices by town and what drives the cost. Figures from our own quotes and market prices.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Veterinary hospital construction · Cancún · Playa del Carmen · Puerto Morelos · Chetumal · Hospitals & clinics

1. Costs in 2026 (Cancún base)

ItemCost
Veterinary clinic fit-out, per m²$12,000–$22,000
Veterinary hospital new build, per m² (surgery, imaging, wards)$22,000–$38,000
Surgery suite with anaesthesia and oxygen$1.2M–$3M
X-ray room with lead shielding$0.6M–$1.6M
Clinic 150–250 m², complete fit-out$2.5M–$5.5M
Veterinary hospital 600–900 m²$16M–$32M

2. By town

TownFactorVeterinary hospital 600–900 m²
Cancún×1.00$16M–$32M
Playa del Carmen×1.04$16.6M–$33.3M
Puerto Morelos×1.09$17.4M–$34.9M
Chetumal×0.92$14.7M–$29.4M
Cozumel×1.22$19.5M–$39M
Isla Mujeres×1.26$20.2M–$40.3M
Holbox×1.30$20.8M–$41.6M

3. Flow, hygiene and noise

A good vet hospital separates clean from contaminated, dogs from cats and patients from the waiting room. We plan the flow with your team, then specify floor drains, washable surfaces, separate ventilation for isolation and acoustic walls around kennels so barking stays inside.

4. Imaging and permits

X-ray and CT rooms need shielding calculated by a physicist and registered with the health authority; surgery needs medical gases installed to standard. We include the shielding study, gases and the documents for the sanitary licence.

5. Not included

  • Land, VAT and financing
  • Design and permits: 6–10% of construction
  • Contingency 5–10%

FAQ

In 2026 a clinic fit-out costs about $12,000–$22,000 MXN per m²; a complete 150–250 m² clinic $2.5M–$5.5M and a 600–900 m² hospital $16M–$32M.

Yes: we add drainage, ventilation, shielding and acoustic walls inside an existing local or plaza unit.

Clinic fit-out 2–4 months; a new hospital 8–12 months.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews