Hospitals and clinics in the Riviera Maya cannot stop treating patients to renovate. We work in phases behind infection-control barriers, with negative pressure, dust control and separate routes, and renovate operating theatres, ICUs, patient rooms, imaging and consulting areas, medical gases and power — to COFEPRIS standards.
Sealed barriers, negative pressure, HEPA and dust monitoring.
Clean-room finishes, laminar flow, gases and isolated power.
Rooms, bathrooms and nurse call renewed floor by floor.
Oxygen, vacuum and air networks renewed and certified.
Generators, UPS and isolated circuits for clinical areas.
Compliance with sanitary regulations and documentation.
Every phase starts with a plan agreed with the medical team: which rooms close, how patients and staff move, where the barriers go and when noisy work happens. Barriers are sealed to the slab, work areas held under negative pressure and dust measured daily. Shut-downs of gases and power are planned and tested.
These are the most demanding rooms: seamless washable finishes, laminar airflow, pressure cascades, medical gases, isolated power and testing before use. We build them to the same standard as a new hospital.
| Town | Factor | Operating theatre / ICU per m² |
|---|---|---|
| Cancún | ×1.00 | $35,000–$65,000 |
| Playa del Carmen | ×1.04 | $36,000–$68,000 |
| Chetumal | ×0.92 | $32,000–$60,000 |
| Cozumel | ×1.22 | $43,000–$79,000 |
| Item | Cost |
|---|---|
| Consulting and admin areas refit, per m² | $12,000–$22,000 |
| Patient rooms and wards, per m² | $18,000–$32,000 |
| Operating theatre or ICU remodel, per m² | $35,000–$65,000 |
| Medical gas renewal, per room | $147,000–$490,000 |
| Infection-control barriers and phasing, per month | $80,000–$250,000 |
Related: Supermarket renovation · School renovation
Commercial cost calculator · Plazas · Offices
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews