A supermarket in the Riviera Maya cannot close for a remodel. We renovate at night and by zones, moving gondolas and stock with your team, replacing refrigeration case by case without breaking the cold chain, and leaving the store clean and safe every morning — for chains, franchisees and independents.
Work between closing and opening, store ready every morning.
Cases and racks replaced without breaking the cold chain.
Lighting that sells fresh and cuts the bill.
Departments, checkouts and back-of-house rearranged.
Facade, signage and finishes to the new brand manual.
Barriers, cleaning and inspections before opening.
We divide the store into zones, prepare off-site everything that can be prefabricated, and work between closing and opening. Refrigeration is changed one line at a time with temporary cases, coordinated with your merchandising team so stock never waits outside the cold chain.
Old refrigeration and lighting are the biggest electricity loads in a store. New cases with doors, efficient racks with natural refrigerants and LED lighting often cut the bill by a third, which pays a large part of the remodel.
| Town | Factor | 1,500 m² full remodel |
|---|---|---|
| Cancún | ×1.00 | $12M–$24M |
| Playa del Carmen | ×1.04 | $12.5M–$25M |
| Chetumal | ×0.92 | $11M–$22.1M |
| Puerto Morelos | ×1.09 | $13.1M–$26.2M |
| Item | Cost |
|---|---|
| Store refresh (finishes, lighting, signage), per m² | $2,000–$6,000 |
| Full remodel incl. MEP and layout, per m² | $8,000–$16,000 |
| Refrigeration replacement (cases, racks, natural refrigerants), per m² of sales floor | $4,000–$8,000 |
| LED lighting and controls, per m² | $1,000–$1,000 |
| Full remodel of a 1,500 m² store | $12M–$24M |
Related: Hospital & clinic renovation · School renovation
Commercial cost calculator · Plazas · Offices
Supermarket construction
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews