A parking lot in Bacalar is the first thing guests and customers see; we design and build it with the right pavement per zone, drainage, accessible bays and clear markings. Bacalar is growing around the lagoon: access roads to lakeside villas and boutique hotels, streets in new subdivisions, car parks for tourism and private roads along the lagoon shore.
Conduits and bases for lighting, CCTV, EV chargers and solar canopies built in from day one.
Space count, aisles, turning radii, accessible bays, loading zones and pedestrian routes to municipal parking rules.
Grades, kerb inlets, trench drains and infiltration wells sized for tropical downpours.
Runoff must never carry sediment or oil into the lagoon; designs use swales, sediment traps, permeable paving and infiltration away from the shore rather than direct discharge. Grades, inlets and infiltration are designed for these conditions so storms drain in minutes.
Tourist traffic peaks in winter and holidays; works near the lagoon are best planned in the dry season to avoid sediment runoff during heavy rain. We phase the works around this pattern so the business keeps operating.
The municipality of Bacalar and environmental authorities protect the lagoon of seven colours and its stromatolites, so runoff and sediment from roadworks near the shore are strictly controlled.
Around the lagoon the ground is soft white limestone and sascab with clay areas; bases can lose strength when wet, so drainage and compaction control are critical.
| Item | Includes | Price (MXN) |
|---|---|---|
| Asphalt parking lot, complete | Earthworks, base, 5 cm asphalt, drainage, striping | $780–$1,300 / m² |
| Concrete parking lot | Base + 15 cm hydraulic concrete, joints, striping | $1,000–$1,600 / m² |
| Permeable / grass pavers | Base reservoir + permeable surface | $870–$1,600 / m² |
| Line marking | Traffic paint or thermoplastic | $20–$50 / linear m |
Useful pages: Parking Lots — Riviera Maya · Subdivision Infrastructure in Bacalar · Asphalt Repair & Maintenance in Bacalar · Earthworks & Site Prep in Bacalar
Layout, pavement, drainage and striping under one fixed price. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews