Lots in Bacalar sell when buyers drive in on a finished street with water, sewer and power ready; we build that infrastructure phase by phase. The municipality of Bacalar and environmental authorities protect the lagoon of seven colours and its stromatolites, so runoff and sediment from roadworks near the shore are strictly controlled.
As-built drawings, tests and paperwork for municipal reception and connection agreements.
Potable water mains, house connections, sewer lines and lift stations built to CAPA or Aguakan standards.
Duct banks, transformer bases, street lighting and fibre conduits ready for CFE and carriers.
Runoff must never carry sediment or oil into the lagoon; designs use swales, sediment traps, permeable paving and infiltration away from the shore rather than direct discharge. The drainage of every street is designed for these conditions and tested before the pavement goes on.
About three and a half hours from our yard but close to Chetumal’s suppliers; hot mix and materials come from the south of the state, which keeps costs slightly below Cancún. Materials and crews are planned around these constraints so each phase is ready when sales need it.
Around the lagoon the ground is soft white limestone and sascab with clay areas; bases can lose strength when wet, so drainage and compaction control are critical.
Tourist traffic peaks in winter and holidays; works near the lagoon are best planned in the dry season to avoid sediment runoff during heavy rain.
| Item | Includes | Price (MXN) |
|---|---|---|
| Complete infrastructure | Streets, water, sewer, drainage, power, lighting | $1,300–$2,500 / m² of street |
| Per residential lot | Depends on frontage and services | $174,600–$436,500 / lot |
| Kerbs and sidewalks | Cast kerb + 10 cm concrete sidewalk | $370–$630 / m · $470–$820 / m² |
| Storm infiltration well | Drilled well, cased, with inlet and sediment trap | $43,600–$116,400 each |
Useful pages: Subdivision Infrastructure — Riviera Maya · Asphalt Repair & Maintenance in Bacalar · Earthworks & Site Prep in Bacalar · Road Construction in Bacalar
Streets, networks and drainage built to utility standards, phased to your sales. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews