Lots in Puerto Aventuras sell when buyers drive in on a finished street with water, sewer and power ready; we build that infrastructure phase by phase. Solidaridad issues the licences, but inside Puerto Aventuras the residents’ association controls access, materials, colours and working hours, and street works need its prior approval.
As-built drawings, tests and paperwork for municipal reception and connection agreements.
Potable water mains, house connections, sewer lines and lift stations built to CAPA or Aguakan standards.
Duct banks, transformer bases, street lighting and fibre conduits ready for CFE and carriers.
Private streets drain to the marina, the golf course and infiltration wells, many of them silted up; cleaning and resizing wells is often part of any serious resurfacing project here. The drainage of every street is designed for these conditions and tested before the pavement goes on.
Located about 25 minutes south of our yard, Puerto Aventuras is supplied easily, but the single gate and security procedures mean trucks are scheduled in advance and restricted to set hours. Materials and crews are planned around these constraints so each phase is ready when sales need it.
The development stands on shallow limestone with sandy areas near the marina and beach; old streets often have thin bases laid decades ago that cause recurrent potholes and need rebuilding, not patching.
Residents and visitors use the streets all year, so works are phased by street with detours and notices; heavy machinery is usually limited to weekdays and daytime by association rules.
| Item | Includes | Price (MXN) |
|---|---|---|
| Complete infrastructure | Streets, water, sewer, drainage, power, lighting | $1,400–$2,900 / m² of street |
| Per residential lot | Depends on frontage and services | $199,800–$499,500 / lot |
| Kerbs and sidewalks | Cast kerb + 10 cm concrete sidewalk | $420–$720 / m · $530–$940 / m² |
| Storm infiltration well | Drilled well, cased, with inlet and sediment trap | $50,000–$133,200 each |
Useful pages: Subdivision Infrastructure — Riviera Maya · Asphalt Repair & Maintenance in Puerto Aventuras · Earthworks & Site Prep in Puerto Aventuras · Road Construction in Puerto Aventuras
Streets, networks and drainage built to utility standards, phased to your sales. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews