Lots in Xpu-Há sell when buyers drive in on a finished street with water, sewer and power ready; we build that infrastructure phase by phase. Licences come from Solidaridad; most access roads cross private or ejido land under easements, and widening or paving them needs agreements with every owner along the route.
Asphalt, concrete or paver streets with kerbs, accessible sidewalks, ramps and signage.
Inlets, collectors and infiltration wells designed for the street catchment and the karst.
Gatehouse, access control, perimeter wall, parks and clubhouse to complete the project.
Unpaved roads lose material with every storm and turn into channels; crossfall, side drains and permeable or sealed surfaces stop the yearly cycle of regrading. The drainage of every street is designed for these conditions and tested before the pavement goes on.
About 30 minutes from our yard; hot-mix trucks reach the highway easily but narrow private roads limit the size of pavers and rollers, so long roads are paved in shorter daily sections. Materials and crews are planned around these constraints so each phase is ready when sales need it.
Between the highway and the beach the ground is limestone with cenotes and thin soil, changing to sand near the coast; sascab roads here rut and wash out quickly without a proper base and crossfall.
Hotels and residents depend on a single access road, so works keep one lane open and are timed around check-in and deliveries; the rainy season makes sascab work difficult from June to October.
| Item | Includes | Price (MXN) |
|---|---|---|
| Complete infrastructure | Streets, water, sewer, drainage, power, lighting | $1,700–$3,300 / m² of street |
| Per residential lot | Depends on frontage and services | $228,600–$571,500 / lot |
| Kerbs and sidewalks | Cast kerb + 10 cm concrete sidewalk | $480–$830 / m · $610–$1,100 / m² |
| Storm infiltration well | Drilled well, cased, with inlet and sediment trap | $57,200–$152,400 each |
Useful pages: Subdivision Infrastructure — Riviera Maya · Asphalt Repair & Maintenance in Xpu-Há · Earthworks & Site Prep in Xpu-Há · Road Construction in Xpu-Há
Streets, networks and drainage built to utility standards, phased to your sales. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes
Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews