Free Quote — We reply in 2 minGet Quote

Supermarket & Convenience Store Construction in Chetumal

For chains, franchisees and independent grocers opening in Chetumal. We build the building, the refrigeration and the services that keep a supermarket selling: insulated cold rooms, refrigerated display cases, loading docks, backup power that protects the cold chain and parking that meets the municipality’s ratio — to the chain’s standards and opening date.

Quick answer: Supermarket & Convenience Store Construction in Chetumal — 2026 prices: Building shell and slab, per m²: $8,000–$13,000 MXN; Refrigeration, cold rooms and display cases, per m² of sales floor: $4,000–$8,000 MXN; Full fit-out (MEP, finishes, lighting), per m²: $4,000–$7,000 MXN; Convenience / express store, 300–600 m²: $5.5M–$12.9M MXN.
Supermarket construction by Recrea Construction in Chetumal
A Recrea Construction project
Chetumal 2026: shell and slab $8,000–$13,000 MXN per m²; refrigeration and cases $4,000–$8,000 per m² of sales floor; full fit-out $4,000–$7,000. Convenience store 300–600 m² $5.5M–$12.9M; neighbourhood supermarket 1,200–2,500 m² $22.1M–$55.2M.

What We Deliver

Cold Chain

Cold rooms, freezers and display cases with remote condensing units.

Backup Power

Generator and transfer switch sized to keep refrigeration running.

Loading & Back of House

Docks, receiving, storage and staff areas planned for deliveries.

Floors

Industrial slabs and finishes for carts, pallets and cleaning.

Parking & Access

Parking ratio, entries and exits approved by the municipality.

Chain Standards

We build to the brand’s manual: we have built for 7-Eleven and GoMart.

Refrigeration and power decide the budget

A supermarket is a refrigerated warehouse that sells. Cold rooms, cases and condensing units can cost as much as the building, and a power cut can spoil the stock in hours, so the electrical service, generator and transfer switch are sized for the refrigeration first. In this heat, roof insulation and condensing units in the shade pay back every month.

Permits and opening

Land use for commerce, construction licence with DRO, Civil Protection, environmental and sanitary requirements, CFE capacity and parking ratio. We coordinate with the chain’s project manager so fixtures, IT and stocking start on the agreed date.

Building in Chetumal

Chetumal is the state capital and a border city with year-round local demand from government, education, health and trade. Costs run about 8% below Cancún, land is cheaper, and projects are financed more locally.

Licences are issued by the municipality of Othón P. Blanco; we file the land use, construction licence with DRO and Civil Protection.

Supermarket Construction Costs in Chetumal (2026, MXN)

ItemCost
Building shell and slab, per m²$8,000–$13,000
Refrigeration, cold rooms and display cases, per m² of sales floor$4,000–$8,000
Full fit-out (MEP, finishes, lighting), per m²$4,000–$7,000
Convenience / express store, 300–600 m²$5.5M–$12.9M
Neighbourhood supermarket, 1,200–2,500 m²$22.1M–$55.2M
Parking, per surface space$23,000–$64,000

In Chetumal: Apartment building construction · Mixed-use buildings · Car dealership construction · Cinema construction · Private school construction · Commercial construction
Supermarket construction in other towns: Cancún · Playa del Carmen · Puerto Morelos
Related: Supermarket construction · Car dealership construction · Cinema construction · Mixed-use buildings
Commercial cost calculator · Plazas · Offices

Why Developers and Owners Build With Recrea

  • One contract from feasibility and permits to handover
  • Fixed price on a line-item budget, milestone payments against verified progress
  • Weekly dated photo and video reports — investors and head offices abroad never need to fly in
  • Built for this coast — salt, humidity, hurricanes and a high water table designed in from day one
  • 18+ years and 196 projects in the Riviera Maya — one-year written warranty

Tell us about your project

Frequently Asked Questions

In 2026 a convenience store of 300–600 m² runs about $5.5M–$12.9M MXN and a neighbourhood supermarket of 1,200–2,500 m² about $22.1M–$55.2M, including refrigeration and fit-out, before land and VAT.

3–5 months for a convenience store and 6–10 months for a supermarket after permits.

Yes: we have built convenience stores for 7-Eleven and GoMart and work to brand manuals.

Get a fixed-price estimate

Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.

Quote on WhatsApp
Cold chainBackup powerChain standardsFixed priceWeekly reports18+ Years

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún · How Much Does It Cost to Build an Airbnb Villa in Mexico? · Cost to build a supermarket · Supermarket renovation in Chetumal

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews