Bathrooms in bay buildings usually still have original tubs and old pipes; we replace everything down to the slab and waterproof before tiling. We remodel bathrooms in Hotel Zone towers and villas from the slab up: demolition, new plumbing, full waterproofing, large-format tile or stone, walk-in showers, glass and extraction.
New supply and drain lines, valves and pressure checks.
Membranes on floors and shower walls, flood-tested before tiling.
Large-format porcelain, marble and natural stone.
Linear drains, rain heads and frameless glass.
Quiet fans and humidity control against mould.
Freestanding tubs, steam showers and outdoor showers.
Bathrooms in bay buildings usually still have original tubs and old pipes; we replace everything down to the slab and waterproof before tiling.
Most residential buildings on this stretch date from the 1980s and 1990s: generous units, original kitchens and bathrooms, single glazing and old risers. Many owners are long-time residents or families renting monthly rather than nightly.
The bay has calm water and little surf, but buildings still take salt spray and hurricane winds; concrete balconies and steel railings of this age often show chloride corrosion.
A failed shower in a tower damages the unit below; we waterproof, flood-test and document every bathroom so the administration and your insurer have proof.
Cancún water is hard, so we choose fittings and glass treatments that tolerate scale and add filtration where needed.
Older buildings usually have strict administrations: written work plans, set hours, protection of lobbies and lifts, and checks of the unit below before any plumbing change. Bathroom works in towers need the administration's approval and coordination with the unit below for any plumbing change.
You get one English-speaking project manager and one WhatsApp group, a weekly photo and video report, a live budget and payments by milestone after each stage is checked; most owners only fly in for handover.
| Scope | Includes | Price (MXN) |
|---|---|---|
| Refresh | Fixtures, vanity, mirror, paint | $35,000–$70,000 |
| Standard remodel 4–6 m² | Plumbing, waterproofing, porcelain, glass | $95,000–$180,000 |
| Master bathroom | Large-format, double vanity, rain shower | $180,000–$300,000 |
| Premium / spa | Stone, freestanding tub, steam | $300,000–$450,000+ |
Useful pages: Bay Beaches: Langosta, Tortugas and Caracol · Bathroom Remodel: all of Hotel Zone · Hotel Zone residences: full offer and calculator
Send the unit or lot and what you want to do; you get a scoped quote with fixed prices in a few days.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews