We remodel bathrooms between Chac Mool and Marlin with large-format porcelain, walk-in showers and full waterproofing, following each tower's plumbing rules. We remodel bathrooms in Hotel Zone towers and villas from the slab up: demolition, new plumbing, full waterproofing, large-format tile or stone, walk-in showers, glass and extraction.
New supply and drain lines, valves and pressure checks.
Membranes on floors and shower walls, flood-tested before tiling.
Large-format porcelain, marble and natural stone.
Linear drains, rain heads and frameless glass.
Quiet fans and humidity control against mould.
Freestanding tubs, steam showers and outdoor showers.
We remodel bathrooms between Chac Mool and Marlin with large-format porcelain, walk-in showers and full waterproofing, following each tower's plumbing rules.
Beachfront condo towers of different generations with large units and penthouses; owners range from residents to investors in monthly and vacation rental, and many units are due for a full interior or a penthouse upgrade.
Open-sea exposure means stronger wind, salt and hurricane loads than on the bay: impact glazing, sealed frames, marine-grade metal and wind-rated terrace designs are standard in our specifications.
A failed shower in a tower damages the unit below; we waterproof, flood-test and document every bathroom so the administration and your insurer have proof.
Cancún water is hard, so we choose fittings and glass treatments that tolerate scale and add filtration where needed.
Beachfront towers require administration approval, insurance and deposits; roof and terrace works also need structural review and, for plunge pools, the building's sign-off. Bathroom works in towers need the administration's approval and coordination with the unit below for any plumbing change.
You get one English-speaking project manager and one WhatsApp group, a weekly photo and video report, a live budget and payments by milestone after each stage is checked; most owners only fly in for handover.
| Scope | Includes | Price (MXN) |
|---|---|---|
| Refresh | Fixtures, vanity, mirror, paint | $35,000–$70,000 |
| Standard remodel 4–6 m² | Plumbing, waterproofing, porcelain, glass | $95,000–$180,000 |
| Master bathroom | Large-format, double vanity, rain shower | $180,000–$300,000 |
| Premium / spa | Stone, freestanding tub, steam | $300,000–$450,000+ |
Useful pages: Central Hotel Zone: Chac Mool to Marlin · Bathroom Remodel: all of Hotel Zone · Hotel Zone residences: full offer and calculator
Send the unit or lot and what you want to do; you get a scoped quote with fixed prices in a few days.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews