Free Quote — We respond in 2 minGet Quote

Construction Permits & Licenses in the Riviera Maya

We handle the entire permit process as part of our construction service. Our team has relationships with municipal offices across the Riviera Maya — you focus on your project, we handle the bureaucracy.

Permitted foundation works on a Recrea construction site
A Recrea Construction project
500+
Permits Obtained
100%
Approval Rate
5
Municipalities
18+
Years

Permits We Handle

Land Use Permit (Uso de Suelo)

Municipal zoning verification and land use authorization. Required before any construction begins.

Timeline: 2–4 weeks · Cost: $10,000–$30,000 MXNNone

Construction License (Licencia de Construcción)

Official construction permit. Includes DRO (Director Responsable de Obra) sign-off and municipal registration.

Timeline: 4–8 weeks · Cost: $30,000–$80,000 MXNNone

Environmental Impact (MIA)

Manifestación de Impacto Ambiental for lots in ecological zones, near cenotes, or mangroves. SEMARNAT approval.

Timeline: 8–16 weeks · Cost: $60,000–$160,000 MXNNone

CONAGUA Water Permit

Required for wells, cenote proximity, or water discharge. Federal water authority process.

Timeline: 6–12 weeks · Cost: $40,000–$100,000 MXNNone

CFE Electrical Connection

Grid connection application, meter installation, and temporary construction power supply.

Timeline: 2–6 weeks · Cost: $6,000–$20,000 MXNNone

Habitability Certificate

Final municipal inspection certifying the building meets code. Required for occupancy and permanent utilities.

Timeline: 2–4 weeks · Cost: $10,000–$30,000 MXNNone

Alignment & Official Number

Alineamiento y número oficial — required before construction license. Confirms lot boundaries vs. street.

Timeline: 1–2 weeks · Cost: $200–$10,000 MXNNone

Civil Protection Permit

Protección civil approval for commercial buildings. Fire safety, evacuation plans, emergency equipment.

Timeline: 2–4 weeks · Cost: $10,000–$40,000 MXNNone

The Process

1
Site Assessment

We evaluate your lot, check zoning, identify required permits, and estimate costs and timelines.

2
Documentation

We prepare all technical documents, studies, and applications on your behalf.

3
Submission & Follow-up

We submit to all authorities and handle follow-ups, corrections, and inspections until approval.

4
Permits in Hand

You receive all approved permits. Construction begins immediately.

Municipalities We Work With

Solidaridad (Playa del Carmen)
Tulum
Benito Juárez (Cancún)
Puerto Morelos
Lázaro Cárdenas (Holbox)
Bacalar
Permits-Only Service

Don't need construction? We also offer permits-only services — we handle all your paperwork while you build with your own team. Contact us for a quote.

Free: Construction Cost Guide 2026

Real prices per m², land costs, permits, hidden fees. PDF from 196+ projects in the Riviera Maya.

1-Year Written Warranty18+ Years196+ ProjectsLicensedInsured

The correct order of the file

Land-use certificate first: if the lot does not permit what you want, no design fixes it and everything else is wasted. Then alignment and official number, services feasibility, the project signed by a DRO, and with those, the construction licence. In parallel where it applies, the environmental file — which is what actually sets the calendar in Tulum, Puerto Morelos and near protected areas.

Why files get returned

Rarely because the authority is slow — because the file arrives incomplete. Drawings that do not match the land-use certificate, density or height beyond what is permitted, wastewater unresolved, DRO documentation arriving after everything else, or a declared area that does not match the survey. Each return restarts the clock, and it is the difference between three weeks and three months.

What we control and what we do not

We assemble the file, engage the DRO, submit, follow up and answer requirements. We do not control resolution times or environmental criteria, and we tell you realistic ranges at the start rather than an optimistic date that becomes a construction problem three months later.

Get a Free Quote

Send your project details. Response within 24 hours.

Get Free Quote

Get a Free Quote

Expert Guides — Playa del Carmen, Tulum, Puerto Aventuras, Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews