Turnkey new builds in the Riviera Maya: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Playa del Carmen, Tulum, Cancún, Puerto Aventuras, Akumal and Puerto Morelos since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $1.5M – $2.7M MXN | $83,000 – $150,000 USD |
| 150 m² house | $2.5M – $4.9M MXN | $140,000 – $270,000 USD |
| 200 m² house | $3.3M – $6.5M MXN | $183,000 – $360,000 USD |
| 300 m² house | $7M – $14.6M MXN | $390,000 – $810,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Permits: Construction permits, licences and DRO
This is how we run every new build, with the timings we actually see in the Riviera Maya:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 2–5 months of design and permits.
Every municipality has different rules and that is the first source of delays. Solidaridad (Playa del Carmen) works through the PDU and a municipal DRO; Benito Juárez (Cancún) adds FONATUR in Puerto Cancún and the Hotel Zone; Tulum requires SEMA environmental authorisation on most lots; Puerto Morelos, its own municipality since 2016, applies stricter criteria because of the reef. We build in all four and start the right process for your lot.
The whole coast sits on limestone with cenotes, caverns and a shallow water table. A soil-mechanics study — plus a geophysical survey where cavern risk exists — decides the foundation and is the best money you will spend on the project.
We build along the whole corridor, from Puerto Morelos to Tulum, with one team, one contract and one site manager. The cost gap between the ends of the corridor reaches 15% through logistics and regulation.
Useful guides: House construction in Puerto Aventuras · House construction in Akumal · Construction company in the Riviera Maya · House construction in Playa del Carmen · House construction in Cancún · House construction in Tulum · Permits, licences and DRO · Turnkey construction for foreigners


The Riviera Maya is not a municipality but a corridor of some 130 kilometres between Puerto Morelos and Tulum, with four municipal authorities and three distinct environmental regimes. This page gathers what is common to the whole corridor; what changes from one end to the other — jurisdiction, density, services and salt exposure — is set out on the individual zone pages.
The water table is deep, so conventional foundations — isolated and strip footings — need no dewatering during the pour. The trade-off is rock: where compact limestone appears, excavating for pool and cistern calls for a hydraulic breaker and pushes up the earthworks.
The competent municipality is varía: Solidaridad, Tulum, Benito Juárez, Puerto Morelos, and the environmental file falls to municipal, SEMA o SEMARNAT depending on the parcel.
What decides this particular plot: lo primero es saber qué municipio es competente: cambia licencia, reglamento y plazos.
Access: corredor de la federal 307.
Low salt exposure. 316 stainless can be reserved for genuinely exposed work with 304 used indoors, which saves noticeably on metalwork and steel joinery without shortening service life.
There is no design committee: the municipal licence is essentially the whole procedure, which shortens the calendar and makes this kind of lot a good candidate for a fixed-price contract, with fewer unknowns underground.