Turnkey new builds in the Cancún Hotel Zone: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in the Hotel Zone, Isla Dorada and Punta Nizuc since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $2.0M – $3.1M MXN | $110,000 – $171,000 USD |
| 150 m² house | $3.2M – $5.6M MXN | $177,000 – $309,000 USD |
| 200 m² house | $4.3M – $7.4M MXN | $238,000 – $409,000 USD |
| 300 m² house | $9.1M – $16.8M MXN | $503,000 – $928,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
This is how we run every new build, with the timings we actually see in the Cancún Hotel Zone:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 3–5 months of design and permits.
In Benito Juárez the building licence goes through the Urban Development office with a DRO-endorsed project. Puerto Cancún and the Hotel Zone add FONATUR sign-off and, on beachfront lots, a ZOFEMAT concession. Gated communities such as Cumbres, Aqua and Lagos also run a design committee with height, façade and working-hours rules.
Limestone with fill areas and a high water table near the Nichupté lagoon. The soil study sets the foundation type and the damp-proofing strategy; on lots near the lagoon, reinforced waterproofing and anti-corrosion protection of the rebar are mandatory.
The Hotel Zone is the most regulated beachfront in the Mexican Caribbean: FONATUR land, a ZOFEMAT concession on the beach and restricted access and working-hour windows because of tourist traffic. We build beachfront residences and penthouses here to a full marine spec — greater rebar cover, treated ironwork, anodised joinery, reinforced waterproofing — because salt exposure is the harshest in the region.
Useful guides: Luxury villas in the Hotel Zone · Construction permits in the Hotel Zone · House construction in Cancún · Cost calculator


196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsApp