Turnkey new builds in the Tulum Hotel Zone: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in the Tulum–Boca Paila road and the coastal strip since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $2.4M – $3.8M MXN | $133,000 – $210,000 USD |
| 150 m² house | $4.1M – $6.9M MXN | $227,000 – $381,000 USD |
| 200 m² house | $5.3M – $9.1M MXN | $293,000 – $503,000 USD |
| 300 m² house | $11.3M – $20.4M MXN | $624,000 – $1,127,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Nearby zones: Aldea Zamá · Soliman Bay · Holistika, Tulum · La Veleta
Permits: Construction permits, licences and DRO
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
Tulum is the strictest municipality on the coast. On top of land use and the municipal licence with a DRO, most projects need environmental authorisation from SEMA (and an MIA where there is land clearing or proximity to cenotes or mangrove). The PDU caps density and height by zone and requires a minimum permeable green area. Budget 3 to 5 months for permits.
Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.
Tulum’s hotel zone is the strip between the Boca Paila road and the sea: the most expensive address in the municipality and the most regulated. Three things overlap here — the federal maritime-terrestrial zone, SEMA environmental authorisation and infrastructure that has historically not been grid-based, with own generation, well and treatment — and none of the three gets solved on the fly. The realistic product is small, properly self-sufficient and backed by a spotless environmental file.
Useful guides: House construction — Tulum · Construction permits in Cancún · House construction · Cost calculator · Construction guides
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Tulum's hotel zone is the strip between the coast road and the sea, towards Boca Paila and Sian Ka'an: boutique hotels, beach clubs and the tightest restrictions on the whole corridor. Between ZOFEMAT, protected dune, coastal vegetation and proximity to the national park, the genuinely buildable area is often a fraction of the lot, and the environmental file can take over a year.
The water table is very high: on most lots water appears in the first metre of excavation. That rules out a basement, forces a flotation check on cisterns and tanks, and makes dewatering during the pour a real budget line rather than a surprise.
The competent municipality is Tulum, and the environmental file falls to SEMARNAT + ZOFEMAT, zona de máxima restricción.
Being beachfront brings ZOFEMAT into play: the federal twenty metres from the tide line are not bought but concessioned, and the concession does not pass to a buyer on its own. Before designing, measure the usable depth of the lot after deducting that strip and the municipal setback line.
What decides this particular plot: franja costera de Tulum: la superficie construible real suele ser una fracción del lote.
Access: carretera costera de un solo carril por sentido.
Severe salt exposure. The standard here is 50 mm of concrete cover over the steel and f'c 250 or higher with a chloride-inhibiting admixture; 316 stainless — not 304 — for balustrades, hardware and anchors; marine-finish aluminium with stainless fixings; condensers on the landward side with coated fins. The premium over an inland lot is 12 to 20 percent, and without it the first refurbishment arrives around year six.
There is no design committee: the municipal licence is essentially the whole procedure, which shortens the calendar and makes this kind of lot a good candidate for a fixed-price contract, with fewer unknowns underground.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews