Turnkey new builds in Aldea Zamá: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Aldea Zamá and its residential sections since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.0M – $3.2M MXN | $110,000 – $177,000 USD |
| 150 m² villa | $3.5M – $5.9M MXN | $193,000 – $326,000 USD |
| 200 m² villa | $4.6M – $7.8M MXN | $254,000 – $431,000 USD |
| 300 m² villa | $9.7M – $17.5M MXN | $536,000 – $967,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Permits: Construction permits in Aldea Zamá
Nearby zones: Petempich Bay · Soliman Bay · Cancún · Ciudad Mayakoba
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Branded residences / resort | $140,000 – $230,000 USD | International hospitality standard: spa, restaurant, common areas and resort service |
| Premium boutique | $110,000 – $175,000 USD | Generous room, pool, terrace and designed common areas |
| Entry boutique | $85,000 – $135,000 USD | Complete room with the community’s finish standard, simple common areas |
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
Land use and the Tulum municipal licence with a DRO, plus SEMA environmental authorisation, which applies across practically the whole area. For lodging: first the land-use certificate with the right use; then the operating licence, Civil Protection sign-off, CFE capacity by occupancy and tourism registration. With SEMA involved, 3 to 5 months of permits — the process starts with the concept design.
Fractured limestone with frequent cenotes and caverns, especially in Región 15 and La Veleta. A geophysical survey is not optional here: finding a cavern under the footprint after the foundation has started costs weeks of delay and hundreds of thousands of pesos.
Aldea Zamá is the part of Tulum where short-term rental is already consolidated: underground services, finished streets and year-round demand. That is why a rental villa works as well as an 8 to 20 key eco-chic boutique hotel. The condition is the usual one in Tulum: land use that allows the operation and the SEMA route resolved before opening, not after.
Useful guides: House construction in Aldea Zamá · House construction in the city · Commercial and hotel construction · Cost calculator
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Aldea Zamá is where Tulum's short-let market concentrates, and also where competition is fiercest. A boutique hotel here competes with hundreds of platform apartments; what separates the ones that fill is the shared amenity — a decent pool, breakfast, coworking — because the apartment next door has none. For a rental villa, three bedrooms with private outdoor space outperforms two studios.
The water table sits at intermediate depth: conventional foundations work, but pool and cistern excavation is best scheduled outside the rainy season.
The competent municipality is Tulum, and the environmental file falls to SEMA.
What decides this particular plot: densidad y altura acotadas por el máster plan; el arbolado existente pesa en el dictamen.
Access: vialidades internas pavimentadas.
Intermediate salt exposure, where a graded standard serves better than applying the beachfront recipe to everything: 316 stainless for anything permanently exposed to weather, 304 defensible indoors and under cover, quality-coated aluminium with stainless fixings — the galvanic couple between a steel screw and an aluminium frame remains the most expensive and most common mistake.
The development has a design committee, and its ruling is worth obtaining before filing with the municipality: a scheme approved by the city and refused by the committee gets redrawn from scratch. It reviews height and storeys, setbacks, facade palette, plant kept out of sight and existing trees. Allow four to eight weeks and a refundable construction bond.