Turnkey new builds in Puerto Aventuras: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in the marina, Xcalacoco, Bahía Chemuyil and the private phases since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $1.7M – $2.7M MXN | $94,000 – $149,000 USD |
| 150 m² villa | $2.9M – $4.9M MXN | $160,000 – $271,000 USD |
| 200 m² villa | $3.8M – $6.5M MXN | $210,000 – $359,000 USD |
| 300 m² villa | $8.1M – $14.6M MXN | $448,000 – $807,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Permits: Construction permits in Puerto Aventuras
Nearby zones: Puerto Cancún · Puerto Morelos · Punta Brava, Puerto Morelos · Punta Maroma
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Premium / signature design | $110,000 – $185,000 USD | Large rooms, pool, spa, restaurant and designer common areas |
| Standard boutique | $90,000 – $150,000 USD | Complete room, pool, terrace, kitchen and common areas |
| Economy / hostel-hotel | $70,000 – $115,000 USD | Functional room, simple common areas, no in-house restaurant |
This is how we run every new build, with the timings we actually see in Puerto Aventuras:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 2–4 months of design and permits.
The licence is filed in Solidaridad — land use under the PDU, drawings signed by a DRO — but the real filter is inside: Puerto Aventuras’ administration and design committee approve massing, façade, colours and working hours before the file even leaves the estate. To operate as a hotel or vacation rental you add zoning for that use, the municipal operating licence, Civil Protection sign-off and tourism registration, plus the estate’s own rental by-laws.
Limestone with a shallow water table and a highly saline environment from the sea and the marina. Beyond the soil study, greater rebar cover, treated ironwork and anodised aluminium joinery are mandatory here: in Puerto Aventuras it is corrosion, not the structure, that ruins badly built houses. Beachfront lots require a ZOFEMAT concession.
Puerto Aventuras is a gated community with a marina, golf and 24/7 security, and that is exactly its product: high-yield rental villas and small hospitality or condo-hotel inside the estate. Nothing is improvised here: the design committee reviews heights, façades and colours, and the administration controls site access, hours and suppliers. In exchange, the guest arrives into a gated setting with marina and beach — which is what sustains the rate.
Useful guides: House construction in Puerto Aventuras · Luxury villas in Puerto Aventuras · Commercial and hotel construction · Cost calculator


Puerto Aventuras lives off the marina, sport fishing and the family visitor looking for security inside a gated development. The basin-front condominium on short let is the dominant product, with a high season shaped by fishing tournaments. The administration regulates tourist letting, and those rules are the first thing to read.
The water table is high, particularly towards the front of the plot. Foundations are resolved shallow and widened, cisterns are anchored against uplift, and pool excavation usually needs dewatering.
The competent municipality is Solidaridad, and the environmental file falls to municipal + ZOFEMAT en frente de marina.
Being beachfront brings ZOFEMAT into play: the federal twenty metres from the tide line are not bought but concessioned, and the concession does not pass to a buyer on its own. Before designing, measure the usable depth of the lot after deducting that strip and the municipal setback line.
What decides this particular plot: muros de canal y escolleras: cualquier intervención en el borde tiene trámite propio.
Access: acceso controlado con registro.
Controlled access means named worker registration, restricted hours and delivery windows. In practice that adds 15 to 25 percent to the programme, at a real cost premium of 8 to 15 percent.
Severe salt exposure. The standard here is 50 mm of concrete cover over the steel and f'c 250 or higher with a chloride-inhibiting admixture; 316 stainless — not 304 — for balustrades, hardware and anchors; marine-finish aluminium with stainless fixings; condensers on the landward side with coated fins. The premium over an inland lot is 12 to 20 percent, and without it the first refurbishment arrives around year six.
The estate's internal rules apply alongside the municipal licence: heights, setbacks, facade materials, working hours and a bond. Ask for them in writing before the concept design, because the criteria get updated and are usually more restrictive than the municipal norm.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews