Turnkey new builds in Playacar: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Playacar Phase I and Phase II since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.0M – $3.1M MXN | $110,000 – $171,000 USD |
| 150 m² villa | $3.4M – $5.6M MXN | $188,000 – $309,000 USD |
| 200 m² villa | $4.4M – $7.5M MXN | $243,000 – $414,000 USD |
| 300 m² villa | $9.4M – $16.9M MXN | $519,000 – $934,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Branded residences / resort | $170,000 – $270,000 USD | International hospitality standard: spa, restaurant, common areas and resort service |
| Premium boutique | $130,000 – $200,000 USD | Generous room, pool, terrace and designed common areas |
| Entry boutique | $100,000 – $150,000 USD | Complete room with the community’s finish standard, simple common areas |
This is how we run every new build, with the timings we actually see in Playacar:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 2–4 months of design and permits.
Two tracks, always: the Playacar design committee (heights, setbacks, roofs, colours, materials) and the Solidaridad municipal licence with a DRO. For lodging the first step is the land-use certificate: only some lots allow hotel use, and without it there is no project. Then come the operating licence, Civil Protection sign-off, a CFE electrical project sized to occupancy and tourism registration. Beachfront adds a ZOFEMAT concession.
The ground is limestone karst: good bearing capacity, but with hidden cavities and cenotes. That is why we start with a soil-mechanics study — it decides between strip footings, a mat foundation or piles, and prevents the classic overrun of discovering a void once the build is underway.
Playacar combines what almost no gated estate has: golf, private beach, security and an established hotel strip in Phase I. For a villa the product is clear and the design code rules. For hospitality the key is land use: Phase I allows hotel use on specific lots, while the residential sections do not. We verify it lot by lot before you buy, because that is what decides whether the project can exist at all.
Useful guides: House construction in Playacar · House construction in the city · Commercial and hotel construction · Cost calculator


196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsApp