Turnkey new builds in Playacar: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Playacar Phase I and Phase II since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.0M – $3.1M MXN | $110,000 – $171,000 USD |
| 150 m² villa | $3.4M – $5.6M MXN | $188,000 – $309,000 USD |
| 200 m² villa | $4.4M – $7.5M MXN | $243,000 – $414,000 USD |
| 300 m² villa | $9.4M – $16.9M MXN | $519,000 – $934,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Permits: Construction permits in Playacar
Nearby zones: Puerto Aventuras · Puerto Cancún · Puerto Morelos · Punta Brava, Puerto Morelos
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Branded residences / resort | $170,000 – $270,000 USD | International hospitality standard: spa, restaurant, common areas and resort service |
| Premium boutique | $130,000 – $200,000 USD | Generous room, pool, terrace and designed common areas |
| Entry boutique | $100,000 – $150,000 USD | Complete room with the community’s finish standard, simple common areas |
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
Two tracks, always: the Playacar design committee (heights, setbacks, roofs, colours, materials) and the Solidaridad municipal licence with a DRO. For lodging the first step is the land-use certificate: only some lots allow hotel use, and without it there is no project. Then come the operating licence, Civil Protection sign-off, a CFE electrical project sized to occupancy and tourism registration. Beachfront adds a ZOFEMAT concession.
The ground is limestone karst: good bearing capacity, but with hidden cavities and cenotes. That is why we start with a soil-mechanics study — it decides between strip footings, a mat foundation or piles, and prevents the classic overrun of discovering a void once the build is underway.
Playacar combines what almost no gated estate has: golf, private beach, security and an established hotel strip in Phase I. For a villa the product is clear and the design code rules. For hospitality the key is land use: Phase I allows hotel use on specific lots, while the residential sections do not. We verify it lot by lot before you buy, because that is what decides whether the project can exist at all.
Useful guides: House construction in Playacar · House construction in the city · Commercial and hotel construction · Cost calculator
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Playacar combines beach, golf and proximity to the centre, with a large hotel stock in Fase I and housing in Fase II. The rules limit tourist use in the residential part, so the viable product is usually the seasonal rental villa rather than a new hotel: almost no free land remains and what happens is rebuilding.
The water table is deep, so conventional foundations — isolated and strip footings — need no dewatering during the pour. The trade-off is rock: where compact limestone appears, excavating for pool and cistern calls for a hydraulic breaker and pushes up the earthworks.
The competent municipality is Solidaridad, and the environmental file falls to municipal, arbolado protegido por el conjunto.
What decides this particular plot: Fase I y Fase II tienen normas distintas, y el arbolado maduro decide el desplante.
Access: acceso controlado, horarios de obra.
Controlled access means named worker registration, restricted hours and delivery windows. In practice that adds 15 to 25 percent to the programme, at a real cost premium of 8 to 15 percent.
Intermediate salt exposure, where a graded standard serves better than applying the beachfront recipe to everything: 316 stainless for anything permanently exposed to weather, 304 defensible indoors and under cover, quality-coated aluminium with stainless fixings — the galvanic couple between a steel screw and an aluminium frame remains the most expensive and most common mistake.
The development has a design committee, and its ruling is worth obtaining before filing with the municipality: a scheme approved by the city and refused by the committee gets redrawn from scratch. It reviews height and storeys, setbacks, facade palette, plant kept out of sight and existing trees. Allow four to eight weeks and a refundable construction bond.