Free Quote — We reply in 2 minGet Quote

Villa and Hotel Construction in Xpu-Há

Turnkey new builds in Xpu-Há: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.

Recrea has been building houses in Xpu-Há, its private communities and the bay since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.

Construction cost in Xpu-Há (2026): villas $14,600 – $30,500 MXN/m² ($810 – $1,690 USD/m²) and boutique hotels from $74,000 USD per key, depending on finish level and excluding land.

What a Villa Costs to Build in Xpu-Há

Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).

House sizeConstruction costEquivalent
100 m² villa$2.0M – $3.0M MXN$110,000 – $166,000 USD
150 m² villa$3.3M – $5.5M MXN$182,000 – $304,000 USD
200 m² villa$4.3M – $7.3M MXN$238,000 – $403,000 USD
300 m² villa$9.2M – $16.5M MXN$508,000 – $912,000 USD

Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.

Permits: Construction permits, licences and DRO

Nearby zones: the Cancún Hotel Zone · Akumal · Aldea Zamá · Petempich Bay

What a Boutique Hotel Costs to Build in Xpu-Há

Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.

LevelUSD per keyWhat it includes
Branded residences / resort$120,000 – $200,000 USDInternational hospitality standard: spa, restaurant, common areas and resort service
Premium boutique$95,000 – $155,000 USDGenerous room, pool, terrace and designed common areas
Entry boutique$74,000 – $118,000 USDComplete room with the community’s finish standard, simple common areas

What a hotel needs beyond the build

  • Municipal operating licence and Civil Protection sign-off
  • Wastewater treatment plant sized to occupancy
  • Water supply and storage: cistern, pumping and, where needed, a desalination unit
  • Contracted electrical capacity with CFE plus a backup generator
  • Kitchen, laundry and service areas to health regulations
  • Hurricane protection: glazing, closures and a season protocol

Construction Process Step by Step

The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.

The breakdown of what the price per m² includes and excludes is common to all our projects.

Permits and Building Rules in Xpu-Há

In Solidaridad the process starts with the land-use certificate and the current PDU: it sets how many storeys and what building density your lot allows. The building licence requires drawings signed by a DRO registered with the municipality, a structural report and services plans. If the lot borders mangrove, dune or a cenote, a state environmental permit is added. Lodging adds another layer: a land-use certificate with hotel designation — not every lot allows it, and it is the first thing we verify — the operating licence, Civil Protection sign-off, a CFE electrical project sized to occupancy and tourism registration. A restaurant open to the public adds health and capacity requirements.

The lot: what decides your foundation

Limestone with cavities and a shallow water table, typical of the coast: the soil study decides between footings, a mat foundation or piles. Being close to the sea, rebar and ironwork get anti-corrosion protection, and on beach lots waterproofing is reinforced and the floor level checked against runoff.

Xpu-Há has beach and private communities with full services twenty minutes from Playa del Carmen. It is one of the few areas where a rental villa or a small boutique comes out at a reasonable cost without giving up infrastructure — provided the lot’s land use allows the operation you want to run.

Useful guides: House construction — Xpu-Há · House construction — Playa del Carmen · Permits, licences and DRO · Commercial and hotel construction · Cost calculator

Why Build With Recrea

Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.

Real Projects

Villa and Hotel Construction in Xpu-Há — Recrea
Villa and Hotel Construction in Xpu-Há — Recrea

Or send us your project details

Frequently Asked Questions

Yes, where land use allows it: the private communities have full services and the cost per key is among the most reasonable on the southern coast.

First, the lot’s land use has to allow hotel operation: without it there is no project, which is why we verify it before you buy. Then come the operating licence, Civil Protection, CFE capacity by occupancy, properly sized wastewater treatment and tourism registration. We handle them alongside the build.

Free quote for your house in Xpu-Há

196+ completed projects. Fixed-price contracts. We reply in 2 minutes.

Get a quote on WhatsApp
Written 1-year warranty18+ years196+ projectsLicensed & DROInsured

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews