Turnkey new builds in Corasol: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Corasol and its residential golf sections since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $2.1M – $3.2M MXN | $116,000 – $177,000 USD |
| 150 m² house | $3.5M – $5.9M MXN | $193,000 – $326,000 USD |
| 200 m² house | $4.5M – $7.8M MXN | $249,000 – $431,000 USD |
| 300 m² house | $9.8M – $17.6M MXN | $541,000 – $972,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen · Villas and hotels in Corasol
Nearby zones: Cozumel · El Cielo, Playa del Carmen · Mayakoba · Playa del Secreto
Permits: Construction permits in Corasol
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
In Solidaridad the process starts with the land-use certificate and the current PDU: it sets how many storeys and what building density your lot allows. The building licence requires drawings signed by a DRO registered with the municipality, a structural report and services plans. If the lot borders mangrove, dune or a cenote, a state environmental permit is added.
The ground is limestone karst: good bearing capacity, but with hidden cavities and cenotes. That is why we start with a soil-mechanics study — it decides between strip footings, a mat foundation or piles, and prevents the classic overrun of discovering a void once the build is underway.
Corasol is Playa del Carmen’s golf community: generous lots, developer design guidelines and an environment built for permanent living rather than short-term rental. Our office is in Corasol, so supervision here is daily and coordination with the estate management is direct.
Useful guides: Luxury villas in Corasol · Construction permits in Corasol · House construction in Playa del Carmen · Cost calculator
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Corasol is organised around an eighteen-hole golf course north of Playa del Carmen, with sections ranging from 500 m² single-family lots to residences fronting the green. Our office is in Corasol, which on site means daily supervision without travel. The development keeps much of its original vegetation, and the committee watches that elevations hold to the master plan's neutral palette.
The water table is deep, so conventional foundations — isolated and strip footings — need no dewatering during the pour. The trade-off is rock: where compact limestone appears, excavating for pool and cistern calls for a hydraulic breaker and pushes up the earthworks.
The competent municipality is Solidaridad, and the environmental file falls to municipal.
What decides this particular plot: retiros al campo de golf y paleta de fachada revisadas antes del expediente municipal.
Access: acceso controlado.
Controlled access means named worker registration, restricted hours and delivery windows. In practice that adds 15 to 25 percent to the programme, at a real cost premium of 8 to 15 percent.
Low salt exposure. 316 stainless can be reserved for genuinely exposed work with 304 used indoors, which saves noticeably on metalwork and steel joinery without shortening service life.
The development has a design committee, and its ruling is worth obtaining before filing with the municipality: a scheme approved by the city and refused by the committee gets redrawn from scratch. It reviews height and storeys, setbacks, facade palette, plant kept out of sight and existing trees. Allow four to eight weeks and a refundable construction bond.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews