Turnkey new builds in Selvamar, Playa del Carmen: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Selvamar and its residential sections since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $1.9M – $2.9M MXN | $105,000 – $160,000 USD |
| 150 m² house | $3.2M – $5.3M MXN | $177,000 – $293,000 USD |
| 200 m² house | $4.1M – $7.1M MXN | $227,000 – $392,000 USD |
| 300 m² house | $8.8M – $15.9M MXN | $486,000 – $878,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen · Villas and hotels in Selvamar, Playa del Carmen
Nearby zones: Xpu-Há · Zazil-Ha and Coco Beach · Chan Chemuyil · Ciudad Mayakoba
Permits: Construction permits, licences and DRO
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
In Solidaridad the process starts with the land-use certificate and the current PDU: it sets how many storeys and what building density your lot allows. The building licence requires drawings signed by a DRO registered with the municipality, a structural report and services plans. If the lot borders mangrove, dune or a cenote, a state environmental permit is added.
The ground is limestone karst: good bearing capacity, but with hidden cavities and cenotes. That is why we start with a soil-mechanics study — it decides between strip footings, a mat foundation or piles, and prevents the classic overrun of discovering a void once the build is underway.
Selvamar is the greenest gated community in Playa del Carmen: blocks surrounded by preserved jungle, walking paths, sports areas and a low density designed for year-round living. Building here means respecting the community’s vegetation ratio and coordinating the minimum authorised clearing; in exchange you get a house integrated into the jungle ten minutes from downtown.
Useful guides: House construction in Playa del Carmen · Construction permits · Prefab and modular homes · Cost calculator
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


Selvamar is an estate north of Playa del Carmen known for keeping strips of jungle inside the development itself, with lots of 300 to 700 m² and tree-lined streets. The administration is particularly protective of trees and setbacks, and there are sections where the required permeable-area percentage exceeds the municipal minimum.
The water table is deep, so conventional foundations — isolated and strip footings — need no dewatering during the pour. The trade-off is rock: where compact limestone appears, excavating for pool and cistern calls for a hydraulic breaker and pushes up the earthworks.
The competent municipality is Solidaridad, and the environmental file falls to municipal.
What decides this particular plot: conjunto con áreas verdes protegidas: retiros y arbolado revisados por la administración.
Access: vialidad interna del fraccionamiento.
Low salt exposure. 316 stainless can be reserved for genuinely exposed work with 304 used indoors, which saves noticeably on metalwork and steel joinery without shortening service life.
The estate's internal rules apply alongside the municipal licence: heights, setbacks, facade materials, working hours and a bond. Ask for them in writing before the concept design, because the criteria get updated and are usually more restrictive than the municipal norm.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews