Free Quote — We reply in 2 minGet Quote

Docks & Piers on Holbox: fixed and floating docks, piers and boat lifts

We build docks, piers and boat lifts on Holbox: bathymetry, ZOFEMAT and environmental permits, piles, hardwood or composite decking and a lift sized to your boat. Holbox is a car-free island of boutique hotels and low-rise villas; premium work here means spas, plunge pools, small courts and lagoon-side docks, with every material ferried from Chiquilá.

Quick answer: Reference ranges on Holbox: Fixed dock (Piles + hardwood/composite deck): $11,700–$20,800 MXN/m²; Concrete pier (Concrete piles and deck): $23,400–$41,600 MXN/m²; Floating pontoon (HDPE floats + gangway): $10,400–$19,500 MXN/m²; Boat lift (Electric, installed): $325,000–$845,000 MXN.
Docks & Piers on Holbox — Recrea
A Recrea Construction project
Holbox, 2026 references: Fixed dock: $11,700–$20,800 MXN/m²; Concrete pier: $23,400–$41,600 MXN/m²; Floating pontoon: $10,400–$19,500 MXN/m².

What We Build

Boat Lifts

Electric lifts for boats and jet skis, stainless and aluminium for salt water.

Dock Services

Shore power, water, LED step lighting and cleats, all marine grade.

Federal Permits

ZOFEMAT or CONAGUA concession, environmental impact statement and municipal licence.

Docks for the waterfront on Holbox

The island is part of the Yum Balam protected area, so works need municipal and environmental approval, building heights and materials are restricted, and vehicles on the island are limited. Pile type, deck height and length follow the bathymetry and the federal concession, never a standard drawing.

Permits, seabed and the water on Holbox

Holbox sits between the Gulf and a shallow lagoon: very humid, salty and exposed to northers in winter, so wood, metal and paint need extra protection and frequent maintenance. Hardware is marine-grade stainless or hot-dip galvanised, and decks are chosen for water, sun and bare feet. The Holbox lagoon is very shallow, so docks run long on slender piles and boat lifts are rarely needed; the Yum Balam reserve adds environmental review.

Materials, crews and access on Holbox

Everything arrives by ferry from Chiquilá and moves on sand streets by golf cart or small truck, about three hours plus the crossing from our workshops, so jobs are planned in tight batches.

Rentals and scheduling on Holbox

High season runs from winter to summer holidays, so most hotels schedule renovation and maintenance in the quieter autumn months.

Dock & Pier Prices (2026) — Holbox

TypeStructurePrice
Fixed dockPiles + hardwood/composite deck$11,700–$20,800 MXN/m²
Concrete pierConcrete piles and deck$23,400–$41,600 MXN/m²
Floating pontoonHDPE floats + gangway$10,400–$19,500 MXN/m²
Boat liftElectric, installed$325,000–$845,000 MXN

Useful pages: Docks & Piers — Riviera Maya · Coastal Protection on Holbox · Wine Cellar & Home Cinema on Holbox · Private Spa & Gym on Holbox

Why Waterfront Owners Choose Recrea

  • One contract: civil works, specialist installer, MEP and finishes coordinated by us
  • Built for salt air and humidity: 316 stainless, marine coatings, vapour barriers where the tropics demand them
  • Fixed price with the specification written in the contract, English-speaking project manager

Tell us about your dock — Holbox

Frequently Asked Questions

Yes. We work on Holbox, about three hours plus a ferry from our Playa del Carmen workshops, with the same project manager, own crews, written quote and photo reports as everywhere on the coast; prices on Holbox are roughly 30% higher than in Cancún.

Reference ranges on Holbox: Fixed dock (Piles + hardwood/composite deck): $11,700–$20,800 MXN/m²; Concrete pier (Concrete piles and deck): $23,400–$41,600 MXN/m²; Floating pontoon (HDPE floats + gangway): $10,400–$19,500 MXN/m²; Boat lift (Electric, installed): $325,000–$845,000 MXN. The final figure depends on the site visit, soil or seabed survey, access and the specification you choose.

In 2026 a fixed dock on piles with a hardwood or composite deck costs about $9,000–$16,000 MXN per m²; a 2 × 10 m dock is roughly $180,000–$320,000 MXN before permits. Floating pontoons run $8,000–$15,000 MXN/m² and boat lifts $250,000–$650,000 MXN.

Yes. Water and the shore are federal: you need a ZOFEMAT concession on the sea or a CONAGUA concession on lagoons, usually an environmental impact statement and the municipal licence. Building without them risks demolition orders and fines.

Get a quote for your dock

Feasibility, permits, piles, deck and lift under one contract. Reply in 2 minutes.

Quote on WhatsApp
Fixed docksMarine-grade hardwareFederal permits18+ Years

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews