Free Quote — We reply in 2 minGet Quote

Bathroom Remodel in Costa Mujeres: waterproofed showers, new plumbing and tile

We remodel bathrooms in Costa Mujeres from the slab up: demolition, new plumbing, full waterproofing, tile, glass and extraction, under one fixed quote. Costa Mujeres is mostly new: beachfront condos, all-inclusive resorts and gated villa projects north of Cancún, where owners usually want to upgrade developer finishes, add outdoor living and set up a maintenance plan before the first rental season.

Bathroom Remodel in Costa Mujeres — Recrea
A Recrea Construction project
Costa Mujeres, 2026 references: Refresh: $42,000–$84,000; Standard remodel 4–6 m²: $114,000–$216,000; Master bathroom: $216,000–$360,000.

What a Recrea Bathroom Includes

Full Waterproofing

Cementitious or liquid membrane over the whole shower and floor, flood-tested for 24 hours before any tile goes down.

New Plumbing

PPR or PEX supply lines, proper traps and venting, and pressure-tested pipes behind every wall we close.

Tile & Stone

Porcelain, large-format slabs, chukum or natural stone, laid flat with levelling systems and epoxy grout in wet zones.

Water and fittings for a bathroom in Costa Mujeres

Water comes through the Cancún network with frequent low pressure in new phases, so most homes rely on cisterns, pressure pumps and filters, and gardens need drip irrigation planned around stored water. That is why we size softeners, filters and pumps with the bathroom, and choose fittings that tolerate scale.

Humidity, salt and finishes in Costa Mujeres

Exposure here is direct: open sea, trade winds and spray reach the front rows of every building, so metal, paint and outdoor finishes corrode faster than in Cancún city and need marine-grade specifications. Grout, paint, extraction and metal fittings are specified for these conditions so the bathroom still looks new after several seasons.

Rules, licences and administration in Costa Mujeres

Building permits come from Isla Mujeres municipality on the continental side, and almost every development has an HOA with design rules, approved work hours and a requirement to register crews and vehicles at the gate.

Materials, crews and access in Costa Mujeres

The zone is about 90 minutes from our workshops and 30 minutes from Cancún suppliers; we group deliveries and keep crews on site for full days so travel does not eat into the job.

Rentals and scheduling in Costa Mujeres

Most units are rented short-term, so we schedule work between bookings, protect common areas and finish noisy tasks before guests check in.

Bathroom Remodel Prices (2026) — Costa Mujeres

ScopeWhat it includesPrice (MXN)
RefreshNew fixtures, vanity, mirror, paint, silicone$42,000–$84,000
Standard remodel 4–6 m²Demolition, plumbing, waterproofing, porcelain, walk-in shower, glass$114,000–$216,000
Master bathroomLarge-format tile, double vanity, rain shower, bathtub$216,000–$360,000
Premium / spaNatural stone, freestanding tub, steam or outdoor shower$360,000–$540,000+

Useful pages: Bathroom Remodel — Playa del Carmen · Landscaping & Garden Design in Costa Mujeres · House Painting in Costa Mujeres · Flooring & Tile in Costa Mujeres

Why Owners Choose Recrea for Their Bathroom

  • 18+ years and 196 projects in the Riviera Maya, written warranty on workmanship
  • Our own crews, not a chain of subcontractors: the same supervisor from first visit to handover
  • Materials chosen for salt air, humidity and 35 °C, not for a showroom in a cold climate

Tell us about your bathroom — Costa Mujeres

Frequently Asked Questions

Yes. We work in Costa Mujeres, about 90 minutes from our Playa del Carmen workshops, with the same supervisor, own crews, written quote and photo reports as everywhere on the coast; prices in Costa Mujeres are roughly 20% higher than in Cancún.

Reference ranges in Costa Mujeres: Refresh (New fixtures, vanity, mirror, paint, silicone): $42,000–$84,000; Standard remodel 4–6 m² (Demolition, plumbing, waterproofing, porcelain, walk-in shower, glass): $114,000–$216,000; Master bathroom (Large-format tile, double vanity, rain shower, bathtub): $216,000–$360,000; Premium / spa (Natural stone, freestanding tub, steam or outdoor shower): $360,000–$540,000+. The final figure depends on the visit, the condition of the property and access.

Get a quote for your bathroom

Design, demolition, plumbing, waterproofing and finishes for one fixed price. Reply in 2 minutes.

Quote on WhatsApp
Walk-in showersFlood-tested waterproofingNew plumbingOwn crews

For owners buying and building from abroad

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico

For owners buying, building and keeping a home here

Contractor stopped? Finishing a stalled build · Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico

See the full concierge service →

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Build or buy in Playa del Carmen? · Cost to build a house in Mexico · How long a build takes

See the full concierge service →

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Closing on property: process and costs · Where to build: area by area · Land use, COS and CUS · Soils studies on limestone · Build or buy in Playa del Carmen?

See the full concierge service →

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews