Free Quote — We reply in 2 minGet Quote

Bathroom Remodel in the Hotel Zone Entrance: walk-in showers, stone and full waterproofing

We replace developer or 1990s bathrooms at the entrance with walk-in showers, full waterproofing and new fittings, checking risers with the unit below. We remodel bathrooms in Hotel Zone towers and villas from the slab up: demolition, new plumbing, full waterproofing, large-format tile or stone, walk-in showers, glass and extraction.

Quick answer: Reference ranges in the Cancún Hotel Zone: Refresh (Fixtures, vanity, mirror, paint): $35,000–$70,000; Standard remodel 4–6 m² (Plumbing, waterproofing, porcelain, glass): $95,000–$180,000; Master bathroom (Large-format, double vanity, rain shower): $180,000–$300,000; Premium / spa (Stone, freestanding tub, steam):…
Bathroom Remodel — Entrance — Recrea
A Recrea Construction project
2026 references: Refresh: $35,000–$70,000; Standard remodel 4–6 m²: $95,000–$180,000; Master bathroom: $180,000–$300,000.

What we do

Demolition and plumbing

New supply and drain lines, valves and pressure checks.

Waterproofing

Membranes on floors and shower walls, flood-tested before tiling.

Tile and stone

Large-format porcelain, marble and natural stone.

Walk-in showers

Linear drains, rain heads and frameless glass.

Extraction

Quiet fans and humidity control against mould.

Spa bathrooms

Freestanding tubs, steam showers and outdoor showers.

Bathroom Remodel in the Hotel Zone Entrance

We replace developer or 1990s bathrooms at the entrance with walk-in showers, full waterproofing and new fittings, checking risers with the unit below.

A mix of new towers delivered in shell or with developer finishes and 1980s–1990s low-rise condos. Buyers here are often first-time Hotel Zone owners and investors looking for a lower entry price than the beachfront.

The setting: Bay and Bojórquez lagoon

Calm bay water and the Bojórquez lagoon mean less wave energy than the south, but salt air and humidity still attack balconies, railings and A/C units.

Leaks in towers are expensive

A failed shower in a tower damages the unit below; we waterproof, flood-test and document every bathroom so the administration and your insurer have proof.

Water, scale and salt

Cancún water is hard, so we choose fittings and glass treatments that tolerate scale and add filtration where needed.

Rules in this sector

New towers apply a fit-out manual with approved drawings, contractor registration and set hours; older condos need administration approval and service-lift booking. Bathroom works in towers need the administration's approval and coordination with the unit below for any plumbing change.

Managed for owners who live abroad

You get one English-speaking project manager and one WhatsApp group, a weekly photo and video report, a live budget and payments by milestone after each stage is checked; most owners only fly in for handover.

Prices 2026 — Bathroom Remodel in the Cancún Hotel Zone

ScopeIncludesPrice (MXN)
RefreshFixtures, vanity, mirror, paint$35,000–$70,000
Standard remodel 4–6 m²Plumbing, waterproofing, porcelain, glass$95,000–$180,000
Master bathroomLarge-format, double vanity, rain shower$180,000–$300,000
Premium / spaStone, freestanding tub, steam$300,000–$450,000+

Useful pages: Hotel Zone Entrance · Bathroom Remodel: all of Hotel Zone · Hotel Zone residences: full offer and calculator

Why Hotel Zone owners choose Recrea

  • Fixed price per item, written quote
  • Own crews about 50 minutes from our Playa del Carmen workshops
  • Tower administrations and permits handled for you
  • Weekly photo and video reports

Bathroom Remodel — Entrance: free quote

Frequently Asked Questions

A standard bathroom takes 2–4 weeks; a master or spa bathroom 4–6 weeks.

Yes; in condos we usually do all bathrooms together to use one approval and one noisy-work window.

Finishing new apartments delivered in shell or with basic developer finishes, followed by full interiors of older condos bought for rental.

Reference ranges in the Cancún Hotel Zone: Refresh (Fixtures, vanity, mirror, paint): $35,000–$70,000; Standard remodel 4–6 m² (Plumbing, waterproofing, porcelain, glass): $95,000–$180,000; Master bathroom (Large-format, double vanity, rain shower): $180,000–$300,000; Premium / spa (Stone, freestanding tub, steam): $300,000–$450,000+. The final figure comes after the site visit and the building's requirements.

Yes. We handle approvals, crews, purchases and deliveries, send a weekly photo and video report and bill by milestones; keys can stay with us and the property is returned clean and ready.

Your Hotel Zone project, one contractor

Send the unit or lot and what you want to do; you get a scoped quote with fixed prices in a few days.

Quote on WhatsApp
Fixed priceOwn crewsBilingual PMWeekly reportsInsured crews (IMSS)

For owners buying, building and keeping a home here

Fideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone

Related: Condo & Penthouse Fit-Out in Cancún · Smart Home Automation in Cancún

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews