Turnkey new builds in the Ruta de los Cenotes: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in the Ruta de los Cenotes and the Puerto Morelos jungle since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² house | $1.7M – $2.6M MXN | $94,000 – $144,000 USD |
| 150 m² house | $2.8M – $4.7M MXN | $155,000 – $260,000 USD |
| 200 m² house | $3.7M – $6.3M MXN | $204,000 – $348,000 USD |
| 300 m² house | $7.9M – $14.2M MXN | $436,000 – $785,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen
Nearby zones: Selvamar, Playa del Carmen · Xpu-Há · Zazil-Ha and Coco Beach · Chan Chemuyil
Permits: Construction permits, licences and DRO
The construction process is the same one we run across the Riviera Maya: lot review, concept design, construction documents, permits, foundation, shell, services and finishes, then turnkey handover. See the full process with per-stage timings.
The breakdown of what the price per m² includes and excludes is common to all our projects.
Puerto Morelos municipality: land use and the licence with a DRO go there. There is no ZOFEMAT here because there is no beach, but there is a serious environmental filter: any lot with a cenote or drainage into the karst system requires authorisation with conditions on clearing, discharges and setback from the water body. Utility feasibility is solved privately and documented: well, treatment and power.
The ground is limestone karst: good bearing capacity, but with hidden cavities and cenotes. That is why we start with a soil-mechanics study — it decides between strip footings, a mat foundation or piles, and prevents the classic overrun of discovering a void once the build is underway.
The Ruta de los Cenotes is Puerto Morelos’ inland jungle corridor: land far cheaper than the coast, cenotes on the lot itself and zero network infrastructure. That is the trade: you save on land and invest in self-sufficiency — well, cistern, treatment plant and solar with backup. And there is a concrete responsibility: the cenotes feed the aquifer that reaches the reef, so wastewater handling allows no shortcuts.
Useful guides: House construction — Playa del Carmen · Construction permits in Puerto Morelos · House construction · Cost calculator · Construction guides
Fixed-price contract by line item, licensed DRO and architects, workers registered with IMSS, weekly photo and video reports and a written one-year warranty.


The Ruta de los Cenotes runs from Puerto Morelos towards Leona Vicario and is, literally, a road over a flooded cave system. Lots are large and cheap compared with the coast, the jungle is well preserved, and the attraction is precisely the cenote on the property. That makes the geophysical survey and the wastewater solution the two decisions that define the project.
The water table is deep, so conventional foundations — isolated and strip footings — need no dewatering during the pour. The trade-off is rock: where compact limestone appears, excavating for pool and cistern calls for a hydraulic breaker and pushes up the earthworks.
The subsoil carries cavities associated with the cenote system, so before fixing the foundation we run ground-penetrating radar on a grid and drill at every anomaly. A void under the slab is not a theoretical risk here.
The competent municipality is Puerto Morelos, and the environmental file falls to SEMARNAT (cenotes y selva).
What decides this particular plot: sistema de cenotes: georradar antes de cimentar y tolerancia cero en descargas.
Access: carretera a Leona Vicario, terracerías.
On an unpaved approach the site road is the first line item — hardcore and drainage ditches — not an improvisation in May: in the rainy season a concrete truck that cannot get in is a cancelled pour that still gets paid for.
Low salt exposure. 316 stainless can be reserved for genuinely exposed work with 304 used indoors, which saves noticeably on metalwork and steel joinery without shortening service life.
There is no design committee: the municipal licence is essentially the whole procedure, which shortens the calendar and makes this kind of lot a good candidate for a fixed-price contract, with fewer unknowns underground.
196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews