We handle construction permits in Playacar end to end at the Solidaridad planning department, after a ruling from the Playacar committee: land use, licence, DRO and utilities. Here the file also carries a ruling from the development committee. You never queue at a counter; we hand over the signed file.
We check density, land use and lot restrictions in Playacar before designing: in Solidaridad the certificate is issued per lot and is the first real filter.
We file and follow the license with the municipality through to the final resolution.
A DRO with an active license signs and is legally responsible for the build and code compliance.
In Playacar no state or federal environmental authority is involved inland: the file is municipal, which is why it starts sooner than on the coast.
Civil Protection sign-off, CFE and water feasibility, plus the ruling from the development committee or management, which in Playacar is required before the municipality.
We hand you the full ordered file: stamped plans, licenses, DRO and authorizations.
Playacar is governed by phase. Phase I and Phase II carry different rules on setbacks, height and site coverage, and the design committee reviews the project before the Solidaridad municipality opens a file. The community's mature trees are protected, and the tree inventory drives where the house can sit.
What eats the most time is not the licence but the facade round: material palette, colour, roofing and window systems are approved piece by piece, and a late change forces the whole review to start again.
Helpful guides: Permits & licenses (Riviera Maya) · Permit management · Topography & plans · House construction in Playacar
We process permits in Playacar and across the Riviera Maya: Tulum, Playa del Carmen, Cancun, Puerto Aventuras, Akumal and Puerto Morelos.
"Recrea got us every permit in Playacar without us setting foot in the municipality. Complete file and build on time."
Owner, Playacar
"They saved us months of back-and-forth. Land use, license and DRO resolved, all in order."
Investor, Playacar
There is no single procedure for the Riviera Maya. In Playacar the competent authority is the Solidaridad municipality, the environmental regime is municipal; mature trees protected by the development, and that decides which documents enter the file and in what order.
Salinity rises noticeably in Phase I, next to the sea. At that distance 304 stainless pits within a couple of years; hardware, window frames and anchors have to be specified in 316 from the design stage rather than corrected later.
The ground is compact limestone and the water table is deep, which weighs on the soil study that accompanies the licence application. Access is gated access with construction hours and the development regime is per-phase rulebook and design committee.
With a complete, well-assembled file, count on 4 to 10 weeks: the whole file is municipal, with no environmental authority in between.
We file with the committee first, with the tree inventory and the palette already settled, and only go to the municipality once we hold their ruling. That is the route that avoids the two or three extra rounds projects here usually suffer.
What decides a project here: Phase I and Phase II follow different rules, and the mature trees decide the footprint.
You can review and compare these figures against other zones in the zone checker.
The design committee's ruling, together with the lot's tree inventory. The phase sets the rule and the trees set the position: a couple of protected specimens can move the whole house within the plot. The committee reviews setbacks, height, roofing, window systems and colour palette piece by piece, and any later change restarts the review. That is why the construction set is developed after the ruling rather than before, and why the architect works from the correct phase's rulebook from the very first sketch.
Both pass through a committee before reaching the Solidaridad municipality, but Playacar adds two variables Corasol does not have: the lot’s phase, which changes setbacks and heights, and proximity to the sea in Phase I, where salinity forces 316 stainless to be specified from the design stage. Corasol is more uniform and more predictable. If you are comparing the two, compare hardware and maintenance cost as well, not just land price per square metre. And check the phase before anything else: a Phase I lot and a Phase II lot of identical size can carry different height limits, different setbacks and a different corrosion specification.
Land use + license + DRO + special authorizations, turnkey. Reply in 2 minutes.