We handle construction permits in Aldea Zamá end to end at the Tulum territorial planning department and the master-plan committee: land use, licence, DRO and utilities. Here the file also carries the state SEMA authorisation and a ruling from the development committee. You never queue at a counter; we hand over the signed file.
We check density, land use and lot restrictions in Aldea Zamá before designing: in Tulum the certificate is issued per lot and is the first real filter.
We file and follow the license with the municipality through to the final resolution.
A DRO with an active license signs and is legally responsible for the build and code compliance.
In Aldea Zamá the state SEMA authorisation comes before the municipal licence. We prepare the study, the authorised clearing and flora rescue where it applies.
Civil Protection sign-off, CFE and water feasibility, plus the ruling from the development committee or management, which in Aldea Zamá is required before the municipality.
We hand you the full ordered file: stamped plans, licenses, DRO and authorizations.
Aldea Zamá is built on a master plan that caps density and height block by block, and the development committee reviews the project before the Tulum municipality does. Existing trees weigh on the ruling: the vegetation inventory is taken before the building position is fixed, not after.
The state SEMA authorisation precedes the municipal licence. Filing with the town hall without it gains nothing, because the file is not opened until the environmental resolution is in the package.
Helpful guides: Permits & licenses (Riviera Maya) · Permit management · Topography & plans · House construction in Aldea Zamá
We process permits in Aldea Zamá and across the Riviera Maya: Tulum, Playa del Carmen, Cancun, Puerto Aventuras, Akumal and Puerto Morelos.
"Recrea got us every permit in Aldea Zamá without us setting foot in the municipality. Complete file and build on time."
Owner, Aldea Zamá
"They saved us months of back-and-forth. Land use, license and DRO resolved, all in order."
Investor, Aldea Zamá
There is no single procedure for the Riviera Maya. In Aldea Zamá the competent authority is the Tulum municipality, the environmental regime is SEMA (Quintana Roo state environmental authority), and that decides which documents enter the file and in what order.
The ground is karst under low jungle and the water table is mid-depth. A soil study with void verification is what stops the foundation being redesigned mid-build, and here the reviewer asks for it.
The ground is karst under low jungle and the water table is mid depth, which weighs on the soil study that accompanies the licence application. Access is paved internal roads and the development regime is development rulebook, design committee.
With a complete, well-assembled file, count on 3 to 6 months: the state SEMA authorisation precedes the licence and is what fixes the start on site.
We close the committee and SEMA stages before developing the construction set, with the tree inventory already validated. The municipality then receives a file that leaves nothing substantive to object to.
What decides a project here: Density and height are capped by the master plan, and the existing tree cover weighs on the ruling.
You can review and compare these figures against other zones in the zone checker.
The validated vegetation inventory, read alongside the master plan. Density and height are already capped block by block, so the design freedom lies in where the house sits, and the existing trees decide that more than the architect does. The inventory enters both the state SEMA file and the development committee's review, and both use it to rule on footprint and clearing. Taking it before the concept design saves the redesign round that is almost unavoidable here when it is done the other way around.
Both sit in the Tulum municipality and both go through the state SEMA, but they do not file the same way. Aldea Zamá has a master plan, a development committee and services already in the street: density is capped in advance and the discussion is about image and trees. La Veleta has no committee, and there the uncertainty is infrastructure. Anyone comparing land prices between the two usually forgets that in one you pay for design review and in the other you pay for the utility connection.
Land use + license + DRO + special authorizations, turnkey. Reply in 2 minutes.
Quote on WhatsAppYour review helps other owners decide, and helps us improve.