Playa del Carmen has grown faster than its sewer. The centre and the older colonias connect to the network, but the coastal corridor north towards Punta Bete and Punta Maroma, the resorts and residences around Mayakoba, the road south towards Puerto Aventuras and many new subdivisions on the west side depend on their own treatment. Under all of it lies the cave and cenote system that makes this coast unique. We design and build plants that protect it.
Plants for resorts and condos between Playa and Punta Maroma, outside the urban network.
Plants and upgrades for residences and hospitality projects in the Mayakoba zone.
Treatment for developments and hotels along Highway 307 south of the city.
Plants for new subdivisions where the network has not arrived yet.
Treated water for irrigation in resorts and communities.
Discharge permits, environmental conditions and lab testing.
The land around Playa del Carmen sits over one of the longest underwater cave systems in the world, connected to cenotes and the sea. Any untreated or poorly treated discharge travels fast and far. That is why we build watertight, tested tanks, avoid absorption pits for raw sewage, prefer reuse for irrigation over discharge, and design final disposal with your environmental consultant so the plant passes inspection and protects the aquifer.
Occupancy in Playa swings between low season and peaks at Christmas, Easter and summer holidays. We size for the busiest week, add equalisation for check-out peaks, and choose technologies such as MBBR that cope with load changes, so the plant does not fail exactly when the hotel or condo is full.
| Project | Typical flow | Cost (MXN) |
|---|---|---|
| Boutique hotel / condo | 10–50 m³/day | $0.85M–$3.2M |
| Resort / tower | 50–200 m³/day | $3.2M–$11M |
| Development / resort complex | 200–1,000 m³/day | $11M–$42M+ |
Useful pages: Wastewater Treatment Plants — Riviera Maya · Same service in Cancún · Water Purification in Playa del Carmen · Villa Wastewater Systems Around Playa · Rainwater & Greywater Reuse in Playa
Sewer feasibility, flow study and budget. Reply in 2 minutes.
Quote on WhatsAppYour review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews