A beach club is a restaurant, a bar, a pool complex and a hotel back-of-house built on the hardest ground there is: sand, salt, wind and a federal beach. This guide gives the 2026 cost per m² for beach bars, full day clubs and spas, two worked budgets, what makes the price move on the coast, and the permit path that decides the design.

Permitted foundation works on a Recrea construction site
A Recrea Construction project

Related: Beach club & spa construction · Beach clubs in Cancún · Beach clubs in Playa del Carmen · Beach club permits · Restaurant fit-out cost

1. Cost per m² by project (2026)

ProjectTypical sizeCost (MXN/m² built)Typical budget (MXN)
Boutique beach bar / club200–400 m² built$25,000–$35,000$5M–$14M
Full beach club / day club500–1,200 m² + pools$35,000–$50,000$18M–$60M
Spa / wellness centre250–800 m²$22,000–$45,000$6M–$36M

The built area includes bar, kitchen, palapas, decks, restrooms, changing rooms and back-of-house. Pools are priced apart: $18,000–$35,000 MXN per m² of water surface, more for infinity edges and swim-up bars. Land or the concession, furniture, kitchen equipment and VAT are extra.

2. Two worked budgets

ItemBoutique beach clubFull day club
Built area300 m² × $30,000800 m² × $42,000
Built area subtotal$9M$33.6M
Pools60 m² × $25,000 = $1.5M250 m² × $30,000 = $7.5M
Total before equipment and furniture≈ $10.5M MXN≈ $41M MXN

Ranges, not quotes: the site, the soil under the sand, the services you must bring yourself and the brand level move the final number by ±20–30%.

3. What moves the price on the beach

  • Foundations in sand: piles or deep footings to rock, and a structure that tolerates a high, salty water table.
  • Hurricanes: roofs, palapas, shade sails and glass calculated for wind, with storm-ready storage for furniture.
  • Salt: stainless 316, hot-dip galvanised steel, marine-grade concrete, sealed electrical equipment.
  • Services: many beach sites have no sewer and a weak grid; a treatment plant, generators or solar can be 10–15% of the budget.
  • Pools: infinity edges, swim-up bars and filtration sized for day-club crowds.
  • Sound: DJ sets need acoustic design so neighbours and the municipality stay on your side.

4. Permits decide the design

The first 20 metres from the high-tide line are federal: anything there — decks, loungers, shade — needs a ZOFEMAT concession. Dunes, vegetation or mangroves bring an environmental authorisation, and sea-turtle nesting rules limit lighting facing the beach. Add the municipal land use, the construction licence, Protección Civil and the alcohol licence. Building is the easy part; we review the permit file with your lawyer before the design is frozen. Full detail: beach club permits.

5. Timeline

PhaseTypical duration
Concession, environmental and municipal permits3–9 months
Design and engineering2–4 months, in parallel
Boutique beach club works4–6 months
Full day club works8–14 months

Heavy works on the beach are planned outside turtle-nesting season where the authorisation requires it, and before the high season you want to open for.

Frequently asked questions

In 2026 about $25,000–$50,000 MXN per m² of built area, plus $18,000–$35,000 MXN per m² of pool. A boutique beach club starts around $5M MXN and a full day club often reaches $18M–$60M MXN, before land, equipment and VAT.

Around $22,000–$45,000 MXN/m² in 2026, depending on hydrotherapy, sauna, steam and imported equipment. Wet areas are the expensive part.

A ZOFEMAT concession for the federal beach strip, environmental authorisation where dunes, vegetation or mangroves are affected, municipal land use and construction licence, Protección Civil, turtle-safe lighting and the alcohol licence.

Permits usually take 3–9 months; works take 4–6 months for a boutique beach club and 8–14 months for a full day club.

Ready to Start Your Project?

196+ completed projects. Fixed-price contracts. Free quote within 48 hours.

Get Free Quote
1-Year Written Warranty18+ Years196+ ProjectsLicensed & DRO

Worked with us? Leave a Google review

Your review helps other owners decide, and helps us improve.

Write a reviewRead our Google reviews