For businesses in Puerto Morelos on CFE’s commercial tariffs, where A/C and refrigeration make electricity one of the largest costs. We design and install rooftop and carport solar systems for plazas, warehouses, supermarkets, hotels and condos: sized from your bills, mounted for hurricane wind, interconnected with CFE and, where outages hurt, backed by batteries.
12 months of CFE bills and demand charges set the system size.
Structure, waterproofing and roof life checked before mounting.
Shade for customers and power for the building.
Racking and anchors engineered for coastal wind.
Distributed generation contract and bidirectional meter.
Backup for refrigeration, servers and critical loads.
Commercial and hotel tariffs in Quintana Roo are high and A/C runs most of the year, so a well-sized system typically pays back in 3–5 years. Systems up to 500 kW connect under CFE’s distributed generation scheme with a bidirectional meter; above that, other permits apply. We size from your demand profile, not just consumption.
A solar system lasts 25 years; many roofs here do not. We check structure and waterproofing first and, if needed, renew the waterproofing before installing, so panels never need to come off for a leak.
Puerto Morelos is low-rise by design: strict height and density, a protected reef and a careful environmental review. Buyers want quiet, small, well-built projects; costs run about 9% above Cancún.
Licences are issued by the municipality of Puerto Morelos; we file the land use, construction licence with DRO and Civil Protection.
| Item | Cost |
|---|---|
| Rooftop system, per kWp installed | $15,000–$24,000 |
| Solar carport, per kWp | $24,000–$35,000 |
| Battery storage, per kWh | $10,000–$16,000 |
| 50 kWp system (small hotel, plaza, office) | $0.8M–$1.2M |
| 200 kWp system (supermarket, warehouse, condo) | $3.1M–$4.8M |
In Puerto Morelos: Gated community construction · Padel club construction · Fitness centre construction · Wedding & event venues · Cold storage construction · Construction permits · Commercial construction
Commercial solar in other towns: Cancún · Playa del Carmen · Chetumal · Cozumel · Bacalar
Related: Water purification & bottling plants · Food processing plants · Block & precast plants
Commercial cost calculator · Plazas · Offices
Solar panels, Riviera Maya
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews