Electric cars, rental fleets and taxis in Cancún are growing faster than public chargers. We build EV charging stations and charging hubs for gas station owners, plazas, hotels, fleets and investors: DC fast and Level 2 chargers, the transformer and CFE connection that are usually the real bottleneck, solar canopies, batteries that cut demand charges and the amenities that make drivers stop.
Chargers from the brands you choose, installed and commissioned.
Transformer, substation and CFE medium-voltage connection.
Steel canopies with PV that shade cars and cut energy cost.
Batteries that shave demand peaks and keep chargers running.
Lounge, café, restrooms and Wi-Fi for the 20–40 minute stop.
Canopies and equipment pads designed for wind and flooding.
Chargers are bought off the shelf; the grid connection is not. DC fast charging needs medium voltage and a transformer, and CFE approval can take longer than the works. We size the load, file the CFE request first and design batteries and solar so you can open with the capacity you have and grow.
A charger earns when it is where drivers wait anyway: plazas, hotels, gas stations, airports. We help you choose the bays, layout and signage, and add canopies and amenities that turn charging time into sales.
Cancún is the largest market in the state: vertical condos along Bonampak, Malecón Tajamar, Puerto Cancún and the Hotel Zone, mid-rise buildings in Cumbres, Arbolada and Huayacán, and the most complete supply chain and labour pool in the region. Heights and densities are set by the urban development programme, and the high water table makes basements expensive.
Licences are issued by the municipality of Benito Juárez; we file the land use, construction licence with DRO and Civil Protection.
| Item | Cost |
|---|---|
| Level 2 charger (7–22 kW), installed | $45,000–$110,000 |
| DC fast charger 60–150 kW, installed | $0.9M–$2.2M |
| Transformer, substation and MV connection | $1.5M–$5M |
| Solar canopy, per kWp | $22,000–$38,000 |
| Battery storage, per kWh | $9,000–$16,000 |
| Charging hub: 8 DC chargers, canopy and amenities | $14M–$32M |
In Cancún: Hostel construction · Golf clubhouses · Commercial & dark kitchens · Church construction · Call centres & BPO · Bus terminals & depots · Daycares & kindergartens · Construction permits · Commercial construction
EV charging stations in other towns: Playa del Carmen · Chetumal · Puerto Morelos
Related: EV charging stations · Bus terminals & depots · Call centres & BPO
Commercial cost calculator · Plazas · Offices
Gas stations
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone