Hotels, beach clubs, fishermen and every shop in Cozumel buy ice every day of the year. We build ice plants for producers and investors: production buildings, cube and block ice machines installed with the supplier, insulated storage, reverse-osmosis water treatment that meets the health standard, bagging and loading for delivery routes — with backup power so production never stops.
Cube and block ice systems with condensers and foundations.
Insulated storage rooms for bagged ice.
Reverse osmosis and disinfection to health standards.
Bagging, sealing and palletising lines.
Refrigerated loading bays for delivery trucks.
Transformer and generator sized for compressors.
Ice is water and electricity. We size reverse osmosis for the local water, the transformer and generator for the compressors, and heat rejection for the climate — then install machines with the supplier.
Demand peaks in high season and hurricanes. We design storage and capacity to cover the peak and leave room for more machines.
In Cozumel every truck of materials crosses by ferry, so costs run about 22% above Cancún and the schedule must plan barges, weather and spare parts. Demand comes from second-home buyers, divers and long-stay rentals.
Licences are issued by the municipality of Cozumel; we file the land use, construction licence with DRO and Civil Protection.
| Item | Cost |
|---|---|
| Ice plant building, per m² | $13,000–$22,000 |
| Ice machines, per 10 t/day | $3M–$7.3M |
| Ice storage cold room, per m² | $11,000–$20,000 |
| Water treatment (reverse osmosis) | $1M–$3M |
| Bagging and loading | $0.7M–$1.8M |
| Ice plant 30 t/day, complete | $17.1M–$34.2M |
In Cozumel: Bank branches · Craft breweries & brewpubs · Pharmacy construction · Dry-stack marinas & boatyards · Commercial construction
Ice plants in other towns: Cancún · Playa del Carmen · Chetumal
Related: Craft breweries & brewpubs · Bakeries & tortilla plants · Ice plants
Commercial cost calculator · Plazas · Offices
Cold storage
Send the plans or the lot; we visit, check land use and permits, and send a line-item budget. Reply in 2 minutes.
Quote on WhatsAppFideicomiso: how foreigners own coastal property · Buying land in Mexico: due diligence · Concierge construction service · Managing a build from abroad · Build or buy in Playa del Carmen? · How long a build takes in Mexico · Contractor stopped? Finishing a stalled build · Closing on property: process and costs · Where to build: area by area · Cost to build a house in Mexico · Land use, COS and CUS · Soils studies on limestone
Your review helps other owners decide, and helps us improve.
Write a reviewRead our Google reviews