1. Construction and FF&E per key in Cozumel (2026)
| Class | Per m² | m² per key | Construction per key | FF&E per key |
|---|---|---|---|---|
| Hostel / economy (2★) | $11,000–$16,000 | 28 | $310,000–$440,000 | $100,000–$180,000 |
| City / business (3★) | $15,000–$21,000 | 40 | $590,000–$830,000 | $180,000–$370,000 |
| Boutique / 4★ | $21,000–$29,000 | 60 | $1,240,000–$1,760,000 | $300,000–$730,000 |
| Luxury / 5★ | $29,000–$49,000 | 110 | $3,220,000–$5,370,000 | $730,000–$1,830,000 |
| All-inclusive resort | $24,000–$39,000 | 95 | $2,320,000–$3,710,000 | $490,000–$1,100,000 |
Cozumel prices run about 22% above Cancún. Land and VAT are extra.
2. The full budget, not just construction
- Construction: 60–70% of the total.
- FF&E and OS&E: furniture, equipment, linens, operating supplies — 10–20%.
- Design, permits and supervision: 8–12% of construction.
- Pre-opening: hiring, training, systems, launch — 3–6%.
- Contingency: 5–10%.
3. Worked budgets
| Project | Construction | All-in before land |
|---|---|---|
| 20-key boutique hotel | $24.9M–$35.1M | $35.5M–$59.6M |
| 40-key city hotel (3★) | $23.4M–$33.2M | $35M–$57.1M |
| 120-key resort (5★) | $386.5M–$644.2M | $543.9M–$1044.1M |
4. Building a hotel in Cozumel
Cozumel hotels serve divers and cruise passengers: mid-size properties along the west coast, dive resorts and small hotels downtown. Everything arrives by ferry, so materials cost about 22% more than in Cancún and the schedule has to plan barges, weather and spare parts.
5. Permits and timeline
Land use, environmental impact (state or federal MIA on the coast), construction licence with DRO, Civil Protection, water, wastewater and CFE connections, then operating licences. Design and permits 4–12 months; construction 10–16 months for a boutique, 18–30 for a resort.
FAQ