Turnkey new builds in Cozumel: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in San Miguel de Cozumel, the north coast and the southern coastal road since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.1M – $3.2M MXN | $116,000 – $177,000 USD |
| 150 m² villa | $3.5M – $5.9M MXN | $193,000 – $326,000 USD |
| 200 m² villa | $4.5M – $7.8M MXN | $249,000 – $431,000 USD |
| 300 m² villa | $9.8M – $17.6M MXN | $541,000 – $972,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
See every zone in Playa del Carmen
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Premium / signature design | $105,000 – $180,000 USD | Large rooms, pool, spa, restaurant and designer common areas |
| Standard boutique | $90,000 – $145,000 USD | Complete room, pool, terrace, kitchen and common areas |
| Economy / hostel-hotel | $72,000 – $110,000 USD | Functional room, simple common areas, no in-house restaurant |
This is how we run every new build, with the timings we actually see in Cozumel:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 3–5 months of design and permits.
Cozumel is its own municipality, with its own PDU and urban development office: land use and the licence with a DRO go there. The critical part is environmental: the reefs are the Arrecifes de Cozumel National Park and the island forms part of a UNESCO-recognised biosphere reserve, so coastal projects are examined closely — there are precedents of licences held up and litigated over proximity to the reef. Beachfront requires ZOFEMAT; a hotel adds the operating licence, Civil Protection and tourism registration.
Highly permeable island limestone: whatever infiltrates reaches the aquifer and, on the coast, the reef. That is why the soil study comes with a serious wastewater solution — treatment plant or biodigester, never a simple septic pit — and runoff control. Structure and ironwork to marine spec, and power backup planned in: on an island a long outage is an operational problem, especially for a hotel.
On Cozumel materials come in only by ferry from Playa del Carmen and by the vehicle and cargo ferries: there is no road. That forces bulk purchasing, on-site storage and a scheduled delivery calendar, and adds 15% to 25% to the cost per m² versus the mainland. The island lives on diving and cruise traffic, so the real demand is rental villas and small boutique hotels, not mass developments.
Useful guides: House construction in Playa del Carmen · Commercial and hotel construction · Eco-lodges and retreats · Cost calculator


196+ completed projects. Fixed-price contracts. We reply in 2 minutes.
Get a quote on WhatsApp