Turnkey new builds in Punta Maroma: design, permits, foundation, structure and finishes under one contract, one site manager and one fixed price.
Recrea has been building houses in Punta Maroma, Punta Bete and the coast north of Playa del Carmen since 2008 — 196+ completed projects across the Riviera Maya. Our architecture, electrical, carpentry and ironwork crews are in-house, so your build does not depend on subcontractors who appear and vanish.
Real budgets for a completed build, excluding land and furniture. The range depends on the finish level: economy, mid or premium (chukum, hardwood, designer kitchen, infinity pool).
| House size | Construction cost | Equivalent |
|---|---|---|
| 100 m² villa | $2.3M – $3.6M MXN | $127,000 – $199,000 USD |
| 150 m² villa | $3.9M – $6.5M MXN | $215,000 – $359,000 USD |
| 200 m² villa | $5.1M – $8.7M MXN | $282,000 – $481,000 USD |
| 300 m² villa | $10.9M – $19.6M MXN | $602,000 – $1,083,000 USD |
Want the exact number for your lot and square metres? Use the cost calculator or ask us for an itemised quote.
Construction cost per key (finished room, excluding land and operations), with island logistics already included. A 12 to 20 key boutique hotel is the format that works best on the island.
| Level | USD per key | What it includes |
|---|---|---|
| Branded residences / resort | $200,000 – $330,000 USD | International hospitality standard: spa, restaurant, common areas and resort service |
| Premium boutique | $155,000 – $240,000 USD | Generous room, pool, terrace and designed common areas |
| Entry boutique | $120,000 – $180,000 USD | Complete room with the community’s finish standard, simple common areas |
This is how we run every new build, with the timings we actually see in Punta Maroma:
Land use, legal status, utilities and cenote or cavern risk. Before you buy, if you have not bought yet.
1–2 weeks
Layout, massing and a preliminary cost per m². This is where the real scope is set against your budget.
2–3 weeks
Architectural, structural, electrical and plumbing drawings signed by a DRO, plus a closed itemised budget.
4–6 weeks
Land use, building licence, DRO, CFE and water hook-ups, environmental permit where required.
4–20 weeks
Soil mechanics, rock excavation, footings or mat foundation and under-slab services.
3–5 weeks
Structure, walls, slabs and roofs — the stage that decides how the house holds up against hurricanes and salt air.
10–16 weeks
Electrical, plumbing, air conditioning, plaster, floors, carpentry, ironwork, pool and chukum.
12–20 weeks
Cleaning, systems testing, house manual, as-built drawings and a written 1-year warranty.
1–2 weeks
Total: 8 to 14 months of construction plus 3–5 months of design and permits.
Punta Maroma is in the Solidaridad municipality, but its zoning is hotel/tourism rather than ordinary residential: the height cap is 3 levels or 15 metres and land use has to be checked lot by lot before you buy. On top of the municipal licence with a DRO come the ZOFEMAT concession on the beachfront and the environmental authorisation, which carries more weight here than anywhere else on the coast because of the reef and the dune. Permits are granted sparingly: the project is designed to fit the rules, not the other way round. Lodging adds another layer: a land-use certificate with hotel designation — not every lot allows it, and it is the first thing we verify — the operating licence, Civil Protection sign-off, a CFE electrical project sized to occupancy and tourism registration. A restaurant open to the public adds health and capacity requirements.
Coastal dune over limestone: the finished floor level, respecting dune vegetation and managing runoff matter as much as bearing capacity. Full marine spec across the build — greater cover, protected rebar, anodised joinery, hurricane-rated glazing and reinforced waterproofing — because exposure here is direct, with nothing to break the salt wind.
Punta Maroma is the most exclusive beachfront north of Playa del Carmen, with hotel/tourism zoning and a 3-level or 15-metre cap. The product here is an exceptional residence or a very contained boutique project: permits are granted sparingly and the design is made to fit the rules.
Useful guides: House construction — Punta Maroma · House construction — Playa del Carmen · Permits, licences and DRO · Commercial and hotel construction · Cost calculator